Loading...
HomeMy WebLinkAboutIntermountain Gas 250812-250813 IGC Control Room Form 1 IPUC Pipeline Safety Inspection Inspector(s): Gatti, Brooks, Perkins Date(s): 250630,250701, 07, 08, 15 250811-13, 15 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 12.5 Inspection summary June 30—July 1, 7, 8, 15, 2025: (4.5 Standard Prep) (Galli 4.0) (Perkins 0.5 7/15) Galli and Perkins reviewed Montana Dakota Utilities (MDU) Control Room Management procedures against the PHMSA Inspection Assistant(IA) and the 2022 IGC Control Room inspection results to prepare for the 2025 Multi-State Control Room Audit with Montana, Wyoming, North Dakota, South Dakota and Minnesota August 1111 2025: (2.0 Standard Travel) Galli and Brooks travelled to Kennewick, WA. August 12-1311 2025: (4.0 Standard) Galli and Brooks met with MDU employees Colby Lundstrom, Wendy McDonough, Darren Tinnerstet, Karmen Thompson, Molly Johnson, Mark Evans, Todd Robinson and Ron Kutzler at the MDU Control Room along with other state programs. PHMSA's IA Question Set for Control Room Management was used as a guide throughout the audit to ensure all areas were completed in compliance with applicable regulations. August 151h 2025: (2.0 Standard Travel) Galli and Brooks traveled back to Boise, ID. Discrepancies: Section 4.1 and 4.8 of OPS 631 omits any reference to the presence of a backup controller on duty during weekday dayshift hours (Monday through Friday). IPUC inspectors recommend the following revisions: • Acknowledge the presence of a backup controller during dayshift hours. • Include the term "primary" when referring to the designated controller to clearly distinguish roles and responsibilities. • Strengthen the language to affirm that no individual may override or supersede the actions or decisions of the primary controller. In OPS 631, specifically when referencing API RP 1165, IPUC inspectors recommend adding the revision number or incorporated by reference (IBR) per 192.7. The SCADA Screen Design Verification Form and the Gas Control Loss of SCADA Communication Test Plan should also be referenced in OPS 631 where applicable. IPUC Inspectors recommend the removal of"significant" from section 9.1 so that control room actions are considered when reviewing any incident that must be reported pursuant to 49 CFR part 191. IPUC Form 1 Rev.12/11/2024 IPUC Pipeline Safety Inspection Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202507 Follow Up Required: ® Yes ❑ No By Date: September 19,2025 Lead Inspector: GaIH Date: Reviewer: Brooks Date: 250821 a,6 01 k0 Signature: � Signature: IPUC Form 1 Rev.12/11/2024