Loading...
HomeMy WebLinkAboutEnbridge 251215 EGUWI Implementation-NTSB IPUC Pipeline Safety Inspection Inspector(s): Galli Date(s): 251215 Company/Owner: Unit/OPID: 12876 Enbridge Gas EGUWI Standard: ® Training: ❑ TIMP/DIMP: ® OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug &Alcohol: ❑ Inspection Days: 0.5 Inspection Summary December 8, 2025: (0.25 TIMP/DIMP) (Galli 0.25) IPUC inspector Galli reviewed the answers provided by Enbridge Gas personnel and observed no discrepancies with the implementation and recordkeeping of the Enbridge Gas Transmission Integrity Management Plan. All applicable sections were in compliance. December 8,2025: (0.25 Standard) (Galli 0.25) IPUC inspector Galli reviewed the 2025 NTSB Recommendations for Enbridge Gas. All applicable sections were in compliance. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Follow Up Required: ❑ Yes ® No By Date: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 251215 Signature: Signature: IPUC Form 1 Rev.12/11/2024