HomeMy WebLinkAboutEnbridge 251215 EGUWI Implementation-NTSB IPUC Pipeline Safety Inspection
Inspector(s): Galli Date(s): 251215
Company/Owner: Unit/OPID: 12876
Enbridge Gas EGUWI
Standard: ® Training: ❑ TIMP/DIMP: ® OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug &Alcohol: ❑ Inspection Days: 0.5
Inspection Summary
December 8, 2025: (0.25 TIMP/DIMP) (Galli 0.25)
IPUC inspector Galli reviewed the answers provided by Enbridge Gas personnel and observed no
discrepancies with the implementation and recordkeeping of the Enbridge Gas Transmission Integrity
Management Plan. All applicable sections were in compliance.
December 8,2025: (0.25 Standard) (Galli 0.25)
IPUC inspector Galli reviewed the 2025 NTSB Recommendations for Enbridge Gas. All applicable
sections were in compliance.
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Follow Up Required: ❑ Yes ® No By Date: NA
Lead Inspector: Galli Date: Reviewer: Brooks Date:
251215
Signature: Signature:
IPUC Form 1 Rev.12/11/2024