HomeMy WebLinkAbout20260109Exhibit B.pdf RECEIVED
DEQ Public Drinking Water System JANUARY 9, 2026
IDAHO PUBLIC
Monitoring Schedule Report UTILITIES COMMISSION
Print Date: July 11, 2023
ID1090297 - IDAHO CLUB
Community water system serving 128 people and 51 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2023 and 12-31-2023
Schedules for Distribution System(s)
Code Group/Analyte Name Monitoring Frequency Season.Begin Date_ .,jeason End Date Satisf
3100 COLIFORM(TCR) I per MN 1/1
DBP2 DBP2-STAGE 2 1 per YR collected in 2023 taken 7/1 through 9/30 7/1
1 set TTHM/HAAS-89 LOWER PACK RIVER RD(DBP2A)
Schedules for tag#: D0026458
Please Label Sampling Point/Location
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
awl Ogg
Sched-uTe-s-To—r Tag : D0073384
Please Label Sampling Point/Location as:"WELL 2"
Code Group/Anallyte Name Monitoring Frequency SfaasianjigginjIgite —Season End Date Satisfied
NNW
—FUTURE"in the"Satisfied"column indicates the sampling requirement begins sometime in the future.Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
—See CO"in the"Satisfied"column indicates the operator needs to contact his or her compliance officer(CO)to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE:This monitoring schedule is provided to you as a courtesy and is current as of July 11,2023 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report.This monitoring schedule may be
changed or modified as needed.This monitoring schedule does not show past unfulfilled schedules for which violations may exist.Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements.Contact your public water system regulating agency if you have any questions.
Date Printed: Tuesday,July 11,2023 Page 1 of 1
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date:January 29, 2024
ID1090297 - IDAHO CLUB
Community water system serving 375 people and 150 connections.
Regulated by: COEUR D ALENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2024 and 12-31-2024
Schedules for Distribution System(s)
C Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
DBP2 DBP2-STAGE 2 1 per YR collec-FeU-in-711=5 7/1 through 9/30- 9130
1 set TFHM/HAA5-89 LOWER PACK RIVER RD(DBP2A)
Schedules for tag#: D0073384
Please Label Sampling PoinVLocation as:"WELL I"
Code Group/Analyte Name 5"NOWWOng C-requt�ncy Season Begin Date Season End Date Satisfied
1 per YR due between 01/0112024 and 12,,31/2024
Ufa -
1 per YR due beboieen 01/01/20--land 12/31'1024
Schedules for tag#: D0026458
Please Label Sampling Point/Location as:"WELL 2"
Code Group/Analyte Name Monitoring Frequency on Begin Season End Date Satisfied
mliillll�——�*�-%7-- - . -
WRC5 VOC Seas sin Date
S-GROUP I per YR due between 01/01/2024 and 12/31/2024 n/ I n/a
IDQW--E- Nrl-RAT E I per YR due between 0110112024 and 12/31/2024 n/a n/a
-FUTURE"in the"Satisfied"column indicates the sampling requirement begins sometime in the future.Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
-See CO"in the"Satisfied"column indicates the operator needs to contact his or her compliance officer(CO)to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE:This monitoring schedule is provided to you as a courtesy and is current as of January 29,2024 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report.This monitoring schedule may be
changed or modified as needed.This monitoring schedule does not show past unfulfilled schedules for which violations may exist.Please revisit the
monitoring schedule tool and review the system's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements.Contact your public water system regulating agency if you have any questions.
Date Printed: Monday,January 29,2024 Page 1 of 9
r%or%
DEQ Public Drinking Water System
Monitoring Schedule Report
Print Date: August 27, 2025
ID1090297 - IDAHO CLUB
Community water system serving 300 people and 120 connections.
Regulated by: COEUR D AL ENE REGIONAL OFFICE
The following schedules include monitoring periods between 1-1-2025 and 12-31-2025
Schedules for Distribution Systern(s)
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
3100 COLIFORM(T CR) I per MN 1/1 12131 Monthly
Dl3P2 DBP2-STAGE 2 1 per YR collected in 2025 taken 7/1*-through 9/30 711 9/30 NO
I set TTHM/HAAS-89 LOINER PACK RIVER RD(DBP2A)
Schedules for Distribution Systerns(s)Lead and Copper
Code GrouplAnallyte Name Monitoring Frequency Season Begin Date Season End Date satisfied
PBCU LCP,-LEAD COPPER 5 per 3Y collected in 2025 taken 6/1 throuo, 9130 6/1 9/30 NO
Note:Consumer notice of lead tap results,regardless of lead level,is required within 30 days after receiving results.For templates and more information,please visit:
https://www2.deq.idaho.gov/water/PublicNotificationTemplates
Schedules for tag#: ID1090297TP
Please Label Sampling Point/Location as:"TREATMENT PLANT(WELLS I &2)"
Code Group/Analyte Name Monitoring Frequency Season Begin Date Season End Date Satisfied
SODI IOC-SODIUM I per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a NO
ZARS ARSENIC(1005) 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a YES
ZF L U IOC-FLUORIDE I per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a NO
z1oc IOCS-PHASE 2 AND 5 1 per 3Y due between 01/01/2023 and 12/31/2025 n/a n/a NO
ZN03 NITRATE 1 per YR due between 01/01/2025 and 12/31,12025 n/a n/a YES
—FUTURE"in the"Satisfied"column indicates the sampling requirement begins sometime in the future.Sampling before the monitoring period begin
date will not satisfy the requirement for the monitoring period.
—See CO"in the"Satisfied"column indicates the operator needs to contact his or her compliance officer(CO)to verify that samples have been taken
and the schedule has been satisfied.
IMPORTANT NOTICE:This monitoring schedule is provided to you as a courtesy and is current as of August 27,2025 Surface water systems and
systems that are disinfecting have additional sampling that is not reflected in this monitoring schedule report.This monitoring schedule may be
changed or modified as needed.This monitoring schedule does not show past unfulfilled schedules for which violations may exist.Please revisit the
monitoring schedule tool and review the systern's monitoring schedule prior to sampling to ensure compliance with the most current monitoring
requirements.Contact your public water system regulating agency if you have any questions.
Date Printed: Wednesday,August 27,2025 Page 1 of 1