Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 251211 Eagle Construction
IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 251211 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: Linder Road x Floating Feather City/District: Eagle Contractor/Job Foreman: Operator Supervisor: None W012404474 K. Oakes Job Description: 4" Steel Main Extension System Type: © GD ❑ GT ❑ GG One-Call Ticket: Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 4" x52 steel pipe 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 feet OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 N/A 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 1 N/A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 N/A - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Stec] Pip OPS 200 SAT Jeeping -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: December 11, 2025: Observations included (Linder x Floating Feather, Eagle, ID): Safety equipment, JSA, verified operator qualifications, bore depth, line pulling, pipe handling, and jeeping. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 251211 Signature: �!_ Signature: IPUC Form 4 Ray.12/10/2024