HomeMy WebLinkAboutIntermountain Gas 251209 Shelley Construction IPUC Construction Inspection Inspector(s): Perkins, Green Date(s): 251209 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: N 800 E: North River Estates City/District: Shelley Contractor/Job#: Foreman: Operator Supervisor: 12402406 John Hodgson Job Description: 2" main/backbone System Type: N GD ❑ GT ❑ GG One-Call Ticket: 2025480632 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 N/A 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 48" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Sand on site/shading SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 97psi 4 hours 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Verified IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 N/A -Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Inspectors travelled to Idaho Falls to observe construction activities. Observations included(N 800 E: North River Estates, Shelley, ID): Safety equipment, line locating, valid dig ticket, verified operator qualifications, pressure test, and correct trench depth. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 251209 Signature: Signature: 25 IPUC Form 4 Rev. 12/10/2024