HomeMy WebLinkAboutL202503 NOPV Response n n a LOWER E R G Y 236 N.Washington •P.O.Box 188 •Afton,WV 83110 °307-885-3175•Fax.307-885-5787 Jeff Brooks Dec 19, 2025 State Of Idaho--Public Utilities Commission H 331 W. Chinden Blvd. Ste 201 A Boise Id. 83714 Subject: Crow Creek Pipeline Construction Inspection—Lower Valley Energy Deport # L202503 Dear Mr. Brooks: Here are the responses to the items of concern discovered during the inspection of Lower Valley Energy's Crow Creek Pipeline project. Items of Concern: 1. Procedures set forth in the Georg Fischer Electro Fusion Installation and training manual Part number 10014339 Revision 9l2017 are not incorporated by reference and are not included within the procedures referenced in this manual. 2. The installation was conducted without the use of the assembly clamps mandated by the applicable manufacture's procedures and regulatory requirements. Response: LVE recognizes each item of concern. Each concern will be addressed below, I. Welding, Fusing & Mechanical Fitting manual section H now revision 5. George Fischer Installation and Training Manual has been referenced and included in the manual. 2. We have been using stab depth marks to make sure nothing has moved but we were not using clamps. We ordered new clamps as we did not have any and will use them going forward when fusing. All Gas Techs have been trained to use them going forward. LVE is confident that we will continue to create a safe working environment and to comply with all regulations at our facilities. Give me a call if you have questions at 307-885-6151 or my cell at 307- 248-2885. Hope you have a nice day. Sincerely, C,('3 Craig Coles Director—Gas Operations cc: Jim Webb