Re: Supplemental Compliance Filing
Case No. IPC-E-25-24 — (Idaho Power Company's Application to Update
Clean Energy Your Way Construction Agreement Pricing Elements Based
on the 2025 IRP)
Dear Commission Secretary:
On July 25, 2025, Idaho Power Company ("Idaho Power" or "Company") filed its
initial application in Case No. IPC-E-25-24, requesting that the Idaho Public Utilities
Commission ("Commission") direct the Company to submit a compliance filing with an
effective date of the first calendar day of the month following a Commission order.
Pursuant to Final Order No. 36847, issued November 14, 2025, the Commission
directed the Company to file revised tariff sheets for Micron Schedule 26, Brisbie
Schedule 33, and Clean Energy Your Way ("CEYW") Program Schedule 62. The
Company submitted a compliance filing on November 24, 2025, with an effective date of
December 1, 2025.
The Company recently identified a timing conflict regarding the implementation of
updated pricing elements. Specifically, the pricing components based on Avoided Cost
Averages and Mid-C P50 pricing from the 2025 IRP cannot be applied as of the December
1, 2025, effective date, as these components, as presented in Attachment 1 and 2 to the
Application, do not begin until January 1, 2026.
Accordingly, the Company respectfully submits this supplemental compliance
filing, including revised tariff sheets to reflect an effective date of January 1, 2026.
Commission Secretary December 12,2025
The following tariff sheets are submitted for Commission approval:
Fifth Revised Sheet No. 26-1 Cancelling Fourth Revised Sheet No. 26-1
Fourth Revised Sheet No. 33-3 Cancelling Third Revised Sheet No. 33-3
Second Revised Sheet No. 62-5 Cancelling First Revised Sheet No. 62-5
If you have any questions about the attached documents, please contact
Regulatory Analyst,Austen Apperson at (208) 388-5729 or aapperson(a-)-idahopower.com.
Sincerely,
/7t""-
(/Grant T. Anderson
GA:sg
Attachments
Idaho Power Company Fifth Revised Sheet No. 26-1
Cancels
I.P.U.C. No. 30, Tariff No. 101 Fourth Revised Sheet No. 26-1
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED MARCH 9, 2022, AMENDED APRIL 11, 2024
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees). Terms used below have the meanings given to them in the
Special Contract referenced above.
Monthly Contract Demand Charge
$3.37 per kW of Contract Demand.
Monthly Billing Demand Charge
$17.83 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
Daily Excess Demand Charge
$1.339 per each kW over the Contract Demand.
Monthly Energy Charge
3.03940 per kWh.
Embedded Energy Fixed Cost Charge
0.00000 per kWh of Renewable Resource On-Site Usage
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos.1, 2, 3, and Second Revised Exhibit 1 of Micron's Special Contract, dated March
9, 2022, as amended.
Renewable Resource Cost
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Excess Generation Credit
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Administrative Charge
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Pricing elements that rely on the most recently filed IRP are effective January 1, 2026, pursuant
to Order No. 36847 issued on November 14, 2025.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36847 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — January 1, 2026 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Fourth Revised Sheet No. 33-3
Cancels
I.P.U.C. No. 30, Tariff No. 101 Third Revised Sheet No. 33-3
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
(Continued)
BLOCK 2
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set forth in
Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees).
Terms used below have the meanings given to them in the Special Contract referenced above.
Daily Excess Demand Charge
$1.320 per each kW over the Contract Demand.
Excess Generation Credit
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021
as amended.
Monthly Contract Demand Charge
$3.28 per kW of Contract Demand.
Monthly Billing Demand Charge
$22.29 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 20,000 kilowatts.
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos. 1, 2, 3, and Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, dated
December 22, 2021, as amended.
Renewable Resource Cost
As included in the Monthly Contract Payment listed in Second Revised Exhibit 3.1 of Brisbie,
LLC's Special Contract, December 22, 2021, as amended.
Supplemental Energy Cost
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Administrative Charge
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Pricing elements that rely on the most recently filed IRP are effective January 1, 2026, pursuant
to Order No. 36847 issued on November 14, 2025.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36847 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — January 1, 2026 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Second Revised Sheet No. 62-5
Cancels
I.P.U.C. No. 30, Tariff No. 101 First Revised Sheet No. 62-5
SCHEDULE 62
CLEAN ENERGY YOUR WAY PROGRAM
(OPTIONAL)
(Continued)
SECTION 2: CLEAN ENERGY YOUR WAY— CONSTRUCTION (Continued)
TERMS AND CONDITIONS
Idaho Power shall have the right to select and reject Program participants at its sole discretion
based on criteria Idaho Power considers necessary to ensure the effective operation of the Program.
The terms and term length of the Renewable Construction Agreement will be determined in a
negotiation between Idaho Power and the Customer(s). The Renewable Construction Agreement will be
subject to Commission approval.
The REF generation cannot be used to offset a Customer(s)' Basic Load Capacity, Billing Demand
or On-Peak Billing Demand.
The Renewable Construction Agreement must include a Customer(s)financial guarantee to cover
stranded REF costs in the event of Customer default, dissolution, and/or relocation. The guarantee
amount will be negotiated between the Customer(s) and Idaho Power based on the value of the REF to
ensure stranded costs are not shifted to non-participants.
Renewable Construction Agreement pricing elements that rely on the most recently filed IRP are
effective January 1, 2026, pursuant to Order No. 36847, issued on November 14, 2025.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36847 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — January 1, 2026 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Fourth Fifth Revised Sheet No. 26-1
Cancels
I.P.U.C. No. 30, Tariff No. 101 Third-Fourth Revised Sheet No. 26-1
SCHEDULE 26
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
MICRON TECHNOLOGY, INC.
BOISE, IDAHO
SPECIAL CONTRACT DATED MARCH 9, 2022, AMENDED APRIL 11, 2024
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set
forth in Schedule 55 (Power Cost Adjustment), Schedule 91 (Energy Efficiency Rider), and Schedule 95
(Adjustment for Municipal Franchise Fees). Terms used below have the meanings given to them in the
Special Contract referenced above.
Monthly Contract Demand Charge
$3.37 per kW of Contract Demand.
Monthly Billing Demand Charge
$17.83 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 25,000 kilowatts.
Daily Excess Demand Charge
$1.339 per each kW over the Contract Demand.
Monthly Energy Charge
3.03940 per kWh.
Embedded Energy Fixed Cost Charge
0.00000 per kWh of Renewable Resource On-Site Usage
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos.1, 2, 3, and Second Revised Exhibit 1 of Micron's Special Contract, dated March
9, 2022, as amended.
Renewable Resource Cost
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Excess Generation Credit
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Administrative Charge
As defined in Second Revised Exhibit 1 of Micron's Special Contract, dated March 9, 2022, as
amended.
Pricing elements that rely on the most recently filed IRP are effective DeEember 1, 2024January
1, 2026, pursuant to Order No. 36383 36847 issued on November 614, 20245.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3681136847 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—Octeber1,2 January 1, 2026 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Third Fourth Revised Sheet No. 33-3
Cancels
I.P.U.C. No. 30, Tariff No. 101d-Third Revised Sheet No. 33-3
SCHEDULE 33
IDAHO POWER COMPANY
ELECTRIC SERVICE RATE
FOR
BRISBIE, LLC.
(Continued)
BLOCK 2
MONTHLY CHARGE
The Monthly Charge is the sum of the following charges, and may also include charges as set forth in
Schedule 91 (Energy Efficiency Rider), and Schedule 95 (Adjustment for Municipal Franchise Fees).
Terms used below have the meanings given to them in the Special Contract referenced above.
Daily Excess Demand Charge
$1.320 per each kW over the Contract Demand.
Excess Generation Credit
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021
as amended.
Monthly Contract Demand Charge
$3.28 per kW of Contract Demand.
Monthly Billing Demand Charge
$22.29 per kW of Billing Demand but not less than Minimum Monthly Billing Demand.
Minimum Monthly Billing Demand
The Minimum Monthly Billing Demand will be 20,000 kilowatts.
Monthly Adjusted Renewable Capacity Credit(s)
See Table Nos. 1, 2, 3, and Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, dated
December 22, 2021, as amended.
Renewable Resource Cost
As included in the Monthly Contract Payment listed in Second Revised Exhibit 3.1 of Brisbie,
LLC's Special Contract, December 22, 2021, as amended.
Supplemental Energy Cost
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Administrative Charge
As defined in Second Revised Exhibit 3.1 of Brisbie, LLC's Special Contract, December 22, 2021,
as amended.
Pricing elements that rely on the most recently filed IRP are effective D eeemberT2024January
1, 2026, pursuant to Order No. 36383 36847 issued on November 148, 20245.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 3681136847 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective—Octeber1,2 January 1, 2026 1221 West Idaho Street, Boise, Idaho
Idaho Power Company Forst Second Revised Sheet No. 62-5
Cancels
I.P.U.C. No. 30, Tariff No. 101 04gi al-First Revised Sheet No. 62-5
SCHEDULE 62
CLEAN ENERGY YOUR WAY PROGRAM
(OPTIONAL)
(Continued)
SECTION 2: CLEAN ENERGY YOUR WAY— CONSTRUCTION (Continued)
TERMS AND CONDITIONS
Idaho Power shall have the right to select and reject Program participants at its sole discretion
based on criteria Idaho Power considers necessary to ensure the effective operation of the Program.
The terms and term length of the Renewable Construction Agreement will be determined in a
negotiation between Idaho Power and the Customer(s). The Renewable Construction Agreement will be
subject to Commission approval.
The REF generation cannot be used to offset a Customer(s)' Basic Load Capacity, Billing Demand
or On-Peak Billing Demand.
The Renewable Construction Agreement must include a Customer(s)financial guarantee to cover
stranded REF costs in the event of Customer default, dissolution, and/or relocation. The guarantee
amount will be negotiated between the Customer(s) and Idaho Power based on the value of the REF to
ensure stranded costs are not shifted to non-participants.
Renewable Construction Agreement pricing elements that rely on the most recently filed IRP are
effective DeEember 1, 2-024January 1, 2026, pursuant to Order No. 3638336847, issued on November
914, 20245.
IDAHO Issued by IDAHO POWER COMPANY
Issued per Order No. 36383 R 3642936847 Timothy E. Tatum, Vice President, Regulatory Affairs
Effective — November 8, ` 024January 1, 2026 1221 West Idaho Street, Boise, Idaho