Loading...
HomeMy WebLinkAboutIntermountain Gas 251201 IPUC IGC Form 1 - DIMP IPUC Pipeline Safety Inspection Inspector(s): Gatti, Brooks, Perkins, Date(s): 251014, 251201 Company/Owner: Intermountain Gas Company Unit/OPID: 8160 Standard: ❑ Training: ❑ TIMP/DIMP: N OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 4.0 Inspection Summary Audit consisted of inspecting Intermountain Gas Company (IGC) for compliance with Subpart P— Gas Distribution Pipeline Integrity Management(DIMP) October 14, 2025: (1.0 DIMP Prep) (Galli 1.0) IPUC inspector Galli reviewed IGC's DIMP procedures against the IA question set. December 1, 2025: (3.0 DIMP) (Galli 1.0) (Brooks 1.0) (Perkins 1.0) Inspectors Galli, Brooks and Perkins attended a virtual DIMP audit and reviewed IGC DIMP records against the IA Distribution Integrity Management question set. Completed IPUC Form 1 and the Post- Inspection Written Preliminary Findings was sent to Colby Lundstrom, Manager of Operations Compliance. Discrepancies: None. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Follow Up Required: ❑ Yes N No By Date: NA Lead Inspector: Gatti Date: Reviewer: Brooks Date: 251201 Signature: �.!� Signature: IPUC Form 1 Rev. 12/11/2024