Loading...
HomeMy WebLinkAboutIntermountain Gas 251204 Eagle Construction IPUC Construction Inspection Inspector(s): Gatti Date(s): 251204 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 5844 and 5864 W Oxton St(Split Service) City/District: Eagle 6229 N Foxglove Way Contractor/Job #: W012412508, Foreman: (Dasco) Operator Supervisor: None W012412440,W012406519 Jose Garcilazo Job Description: %" Service Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025481034, 2025462178 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 3/" inch dated 08/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with Sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning purge 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Verified on Foxglove Way IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Butt fusion observed - Joiner(s) Qualified OPS 309 Stab fitting - Fusion Tools OPS 325 Squeeze off - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (5844 and 5864 W Oxton St (Split Service) Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of completed 3/4"butt fusions, EFV 1200, bedding with sand, successful pressure test, squeeze off, cleaning purge, backfill and continuity testing. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Observations included (6229 N Foxglove Way, Eagle, ID): Line locating, safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, verified proper rollback of completed 3/4"butt fusions, EFV 1200, bedding with sand, successful pressure test, squeeze off, cleaning purge and backfill. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes N No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 251204 Signature: Signature: 1.5 P d g IPUC Form 4 Rev.12/10/2024