Loading...
HomeMy WebLinkAboutIntermountain Gas 251202 Middleton Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 251202 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 545 Midpoint Ave City/District: Middleton Contractor/Job #: W012369210 Foreman: (Dasco) Operator Supervisor: None Ruben Estrada Job Description: %" Service Line System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2025472510 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT %" inch dated 06/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 24" deep OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with Sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 N/A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Butt fusion observed - Joiner(s) Qualified OPS 309 Stab fitting - Fusion Tools OPS 325 Squeeze off - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (545 Midpoint Ave, Middleton ID): Safety equipment, JSA, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, verified proper rollback of completed 3/4"butt fusions,bedding with sand, successful pressure test, squeeze off, backfill and continuity testing. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 251202 aS 1a68 Signature: Signature: IPUC Form 4 Rev. 12/10/2024