Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 251119 IPUC Form 1 - NWGP NTSB Recommendations IPUC Pipeline Safety Inspection Inspector(s): Brooks Date(s): 251119 Company/Owner: Unit/OPID: 39370 Northwest Gas Processing NWGP Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 0.5 Inspection Summary November 19, 2025: (0.5 Standard) (Brooks 0.5) IPUC inspector Brooks reviewed the 2025 NTSB Recommendations for NWGP. All applicable sections have been found to be in compliance. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Follow Up Required: ❑ Yes ® No By Date: NA Lead Inspector: Brooks Date: Reviewer: Date: 251119 Signature: Signature: IPUC Form 1 Rev. 12/11/2024