Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 251113 Weiser Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 251113 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 22 Commercial St City/District: Weiser Contractor/Job #: W012374685 Foreman: Operator Supervisor: None Bryan Gomez Job Description: %" Service Line from 4" STL Main System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025451064 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 3/" inch dated 07/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT At least 36 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 94 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate 4" main IPUC Form 4 Rev. 12n0i2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Butt fusion observed -Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 SAT Weld on 3/" tee -Welder(s) Qualified OPS 201 OAW and SMAW Pipe/Coating=Inspected/Repaired OPS 202 Removal of asbestos wrap - Cathodic Protection OPS 306 UT read of.190" -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(22 E Commercial St, Weiser, ID): Safety equipment, JSA, verified operator qualifications, verified equipment calibration, correct trench depth, observed butt fusion process, verified proper rollback of completed 3/4"butt fusions, UT read of.190", OAW and SMAW, partial bedding with sand, successful pressure test. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 251113 / 1� Signature: �` Signature: "I IPUC Form 4 Rev. 12/10/2024