Loading...
HomeMy WebLinkAboutIntermountain Gas 251113 Eagle Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 251113 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 3344 & 3366 Golden Barrel St City/District: Eagle Contractor/Job: W/O 12395483, Foreman: Operator Supervisor: None On-Site 12377888 S. Strawn Job Description: %" Service Lines System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: 2025443739 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand,native soil SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 PSI-15 Min 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Power IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT Fusing, stabbing. verified iron - Joiner(s) Qualified OPS 309 temp, looked up squeeze/release - Fusion Tools OPS 325 times. - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 3344 & 3366 Golden Barrel St Observations Included: trench depth, safety equipment,utility locating, fusing/stab fit, bedding/backfill, tracer wire, pressure testing, purging, and verification of OQ records. Corrective Action Required: ❑ Yes ® No Compliance Letter: t A Lead Inspector: Perkins Date: Reviewer: B „ 5 Date: 251113 Signature: �' Signature: IPUC Form 4 Rev.12/10/2024