HomeMy WebLinkAboutI202512 NOPV Response EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
November 5,2025
Mr.Jeff Brooks,Programs Manager
Idaho Public Utility Commission
PO Box 83720
Boise,ID 83720-0074
Subject:Response to the Notice of Probable Violation dated September 23,2025(Report#I202512)
Dear Mr.Brooks,
This letter is intended to address one(1)notice of probable violation stemming from a construction inspection in
Jerome,ID conducted by the Idaho Public Utilities Commission(IPUC)on September 17,2025,of Intermountain
Gas Company(IGC)pursuant of Chapter 601 Title,49,United States Code.
PROBABLE VIOLATION
1. 49 CFR§192,605 Procedural manual for operations.maintenance,and emergencies.
General. Each operator shall prepare and follow for each pipe, a manual of written procedures for
conducting operations and maintenance activities and for emergency response.For transmission lines,
the manual must also include procedures for handling abnormal operations. This manual must be
reviewed and updated by the operator at intervals not exceeding 15 months, but at least once each
calendar year. This manual must be prepared before operations of a pipeline system commence.
Appropriate parts of the manual must be kept at locations where operations and maintenance activities
are conducted.
2. 49 CFR §192,756 Joining plastic pipe by heat fusion eauinment maintenance and
calibration.
Each operator must maintain equipment used in joining plastic pipe in accordance with the
manufacturer's recommended practices or with written procedures that have been proven by test and
experience to produce acceptable joints.
3. OPS 307 Polyethylene(PE)Main and Service Construction
4. Cleaning
4.1 Cleaning shall be performed per the manufacturer's instructions, or when butt fusing per TR-33
Appendix A.
4. TR-33 (2012 edition) — Generic Butt Fusion Joining Procedure for Field Joining of
Polyethylene Pile
4.0 MELT.Heating tools that simultaneously heat both pipe ends are used to accomplish this operation.
These heating tools are normally furnished with thermometers to measure internal heater temperature
so the operator can monitor the temperature before each join is made.However,the thermometer can
be used only as a general indicator because there is some heat loss from internal to external surfaces,
depending on factors such as ambient temperatures and wind conditions.A pyrometer or other surface
temperature-measuring device should be used before the first joint of the day is made and periodically
throughout the day to insure proper temperature of the heating tool face that contacts the pipe or fitting
ends. Additionally, heating tools are usually equipped with suspension and alignment guides that
center them on the pipe ends. The heater faces that come into contact with the pipe should be clean,
oil-free and coated with nonstick coating as recommended by the manufacturer to prevent molten
plastic from sticking to heater surfaces.Remaining molten plastic can interfere with fusion quality and
must be removed according to the tool manufacturer's instructions. Never use chemical cleaners or
solvents to clean heating tool surfaces.
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707• (208)377-6000• FAX:377-6097
5. McElroy Operator's Manual—1LC Fusion Machine
Clean Heater Surfaces
The hoo*-must be kept clean and free of any placbc buildup, q
concern-notion and scrwches.
Bekxv each lemon is mode,the surface of dw heater~.t be
wped wiM a clean,non;ynlhetic cio-h
1 LC Fusion Machine Checklist
hem to C},eck satisfactory Needs Repair Comments
Repair
UNIff
Machine is coon
Clomp knob bearing:lubricated and move freely
movable iaw mows freely
Lacking cam works properly
Guide rods ofe not damaged
Clamping jow and insert grooves ore clean
AO null and bolts ore tight
fACER
Check kw ploy in Mode holder
Facer does not wobble when hopped between jaw:
Blades are in good condition
Latch handle locks onto guide rod bvely
Facer maws on guide rods without oxconive 6ce
Facer is clean and free of grvose on blode holder
surface
HEMER
Hvotw surface is rdewt and in good condilan
Thermometer C in good vvrking order
Sunoco twrtpwature chocked with pyrome er
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608- BOISE,IDAHO 83707•(208)377-6000"FAX:377-6097
Finding(s)•
A KV employee was found fusing with a dirty heater surface. Per manufactures recommendations from
McElroy Operations Manual—1 LC Fusion Machine"heater surfaces must be kept clean and free of any plastic
build up, contamination and scratches."KV employees were told by their managers to stop fusing until the
heater can be cleaned or replaced.
O 142°SE M *42.44-7"N,"7-3T12"W!9ft ♦3748ft
;t.N
ri
Rr' V •���11� '
. r
Iron Condition Photo
Intermountain Gas ResLonse
IGC acknowledges the findings brought forth by the IPUC. All fusions conducted with the fusion machine
that day were cut out. The crew was instructed to clean the heater surface prior to continuing work or use a
new fusion machine.
Additionally, fusions procedures were reviewed with the crew reiterating the importance of a clean heater
surface.
Please contact Josh Sanders at(701)222-7773 with questions or comments.
Respectfully Submitted,
�G1I"�✓G�L-[.�0�—
Pat Darras
Vice President,Engineering&Operations Services
Intermountain Gas Company