Loading...
HomeMy WebLinkAboutIntermountain Gas 251028 Caldwell Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 251028 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: 11201& 11213 Trestle Rock St City/District: Caldwell Contractor/Job #: WO 12348605 Foreman: (Dasco) Operator Supervisor: None On-Site H. Talamantez Job Description: 3/" service line installations System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025432305 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 PSIG for 15 Minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pip c OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 11201& 11213 Trestle Rock St, Caldwell, ID. Observations Included: trench depth, EFV installation, safety equipment, tracer wire, line locating, pressure test, line squeeze,purge, verification of OQ records, and discussed fusion requirements. Corrective Action Required: ❑ Yes ® No Compliance Letter: N/A Lead Inspector: Brooks Date: Reviewer: Date: 251028 Signature: Signature: IPUC Form 4 Rev. 12/10/2024