Loading...
HomeMy WebLinkAboutIntermountain Gas 251016 Eagle Construction IPUC Construction Inspection Inspector(s): Galli,Brooks Date(s): 251016 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 1797 and 1809 N Big Star Ave City/District: Eagle Contractor/Job#: W012360321 and Foreman: Operator Supervisor: None W012358270 Jesse Ommundson Job Description: %" Service Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025392959 and 2025392060 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 3/" inch dated 08/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation (Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate stub IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 N/A - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (1797 and 1809 N Big Star Ave, Eagle, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration,hand dig to locate stub and correct trench depth. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Gath Date: Reviewer: Brooks Date: 251016 Signature: / Signature: ` 10 a-tS IPUC Form 4 Rev. 12/10/2024