HomeMy WebLinkAbout20251029Notice of Deposition.pdf RECEIVED
OCTOBER 29, 2025
IDAHO PUBLIC
UTILITIES COMMISSION
C. Tom Arkoosh, ISB No. 2253
Nicholas J. Erekson,ISB No. 9325
ARKOOSH LAW OFFICES
913 W. River Street, Suite 450
P.O. Box 2900
Boise, ID 83701
Telephone: (208) 343-5105
Facsimile: (208) 343-5456
Email: tom.arkooshkarkoosh.com
nick.erekson(a,arkoo sh.com
Admin copy: erin.cecil&arkoosh.com
Attorneys for IdaHydro
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE APPLICATION ) Case No. IPC-E-25-22
OF IDAHO POWER COMPANY FOR )
AUTHORITY TO UPDATE ITS ) NOTICE OF DEPOSITION OF IDAHO
OPERATION AND MAINTENANCE ) POWER COMPANY PURSUANT TO
CHARGES APPLICABLE TO SCHEDULE ) IDAPA 31.01.01.224
72, GENERATOR INTERCONNECTIONS )
TO PURPA QUALIFYING FACILITY )
SELLERS. )
PLEASE TAKE NOTICE that pursuant to IDAPA 31.01.01.224 and Idaho Code § 61-605,
the Idaho Hydroelectric Power Producers Trust, d/b/a IdaHydro, by and through its counsel, C.
Tom Arkoosh and Nicholas J. Erekson of Arkoosh Law Offices,will take the deposition upon oral
examination of Idaho Power Company's ("Idaho Power") designated corporate representative(s)
("Designated Representative") at the following time and place:
Date: November 18, 2025
Time: 9:00 a.m. (Mountain Time)
Location:Arkoosh Law Offices, 913 W. River Street, Suite 450, Boise, ID 83702
TOPICS FOR THE DEPOSITION OF IDAHO POWER'S DESIGNATED
REPRESENTATIVE
Pursuant to IDAPA 31.01.01.224, I.C. § 61-605, and I.R.C.P. 30(b)(6), Idaho Power must
designate a representative to testify regarding the following matters:
1. Segregation of Interconnection Costs. How interconnection-related capital and
operations and maintenance ("O&M") costs are recorded, allocated, or segregated from other
NOTICE OF DEPOSITION OF IDAHO POWER COMPANY PURSUANT TO IDAPA 31.01.01.224—Page 1
generation, transmission, or distribution costs, including the use of FERC or internal account
codes.
2. Inclusion of Interconnection Costs in Avoided Cost Methodologies. Whether, how,
and to what extent such costs were considered or embedded in the Surrogate Avoided Resource
("SAR") and Incremental Cost Integrated Resource Plan("ICIRP") methodologies.
3. Assumptions Regarding Avoided O&M. All assumptions or data used to model
avoided O&M.
4. Consistency Between Avoided Cost Rates and Schedule 72 Charges. Any
reconciliation or cross-check comparing (1) O&M cost paid to QFs as avoided costs to (2) the
current or proposed tariffs in Schedule 72.
5. Preparation of Supplemental Discovery Responses. The personnel, process, and
rationale for revising Idaho Power's Supplemental Response to Interrogatory No. 8.
6. Model Accuracy and Validation. Data, testing, or validation performed to confirm
accuracy of existing and proposed O&M cost models.
7. Distinction Between Gen-Tie and Four-Pole Interconnections. Technical and cost
differences, ownership responsibilities, and O&M treatment for each under Schedule 72.
8. Potential Transition to an Actual Cost Model. Idaho Power's consideration, analysis,
or evaluation of transitioning from an "average" or modeled O&M charge to an actual cost-based
approach, including any internal studies, feasibility assessments, or prior discussions with the
Commission or stakeholders regarding such a transition.
DATED this 29t" day of October 2025.
ARKOOSH LAW OFFICES
Nicholas J. rekson
Attorneys for MaHydro
NOTICE OF DEPOSITION OF IDAHO POWER COMPANY PURSUANT TO IDAPA 31.01.01.224—Page 2
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 29t' day of October 2025, I served a true and correct
copy of the foregoing document(s) upon the following person(s), in the manner indicated:
IDAHO PUBLIC UTILITIES U.S. Mail, Postage Prepaid
COMMISSION: Overnight Courier
Commission Secretary Hand Delivered
Idaho Public Utilities Commission Via Facsimile
11331 W. Chinden Blvd., Building 8, X_ E-mail:
Suite 201-A (83714) secretgakpuc.idaho.gov
P.O. Box 83720
Boise, ID 83720-0074
IDAHO PUBLIC UTILITIES U.S. Mail, Postage Prepaid
COMMISSION STAFF: Overnight Courier
Jeff Loll Hand Delivered
Deputy Attorney General Via Facsimile
Idaho Public Utilities Commission X_ E-mail:
11331 W. Chinden Blvd., Building 8, jeff.loll(a�uc.idaho.gov
Suite 201-A (83714)
P.O. Box 83720
Boise, ID 83720-0074
IDAHO POWER:
Donovan E. Walker U.S. Mail, Postage Prepaid
IPC Dockets Overnight Courier
Idaho Power Company Hand Delivered
1221 W. Idaho Street(83702) Via Facsimile
P.O. Box 70 X E-mail:
Boise, ID 83707 dwalker(cidahopower.com
dockets&idahopower.com
Tim Tatum U.S. Mail, Postage Prepaid
Riley Maloney Overnight Courier
Idaho Power Company Hand Delivered
1221 W. Idaho Street(83702) Via Facsimile
P.O. Box 70 X_ E-mail:
Boise, ID 83707 ttatum(d),idahopower.com
rmaloney&idahopower.com
NOTICE OF DEPOSITION OF IDAHO POWER COMPANY PURSUANT TO IDAPA 31.01.01.224—Page 3
RENEWABLE ENERGY U.S. Mail, Postage Prepaid
COALITION: Overnight Courier
Irion Sanger Hand Delivered
Sanger Greene, P.C. Via Facsimile
4031 SE Hawthorne Blvd. X_ E-mail: irionksanger-law.com
Portland, OR 97214
Nicholas J. Erekson
NOTICE OF DEPOSITION OF IDAHO POWER COMPANY PURSUANT TO IDAPA 31.01.01.224—Page 4