HomeMy WebLinkAbout20251024Errata to Exhibit No. 3.pdf MAN FuwER.,
MEGAN GOICOECHEA ALLEN RECEIVED
Corporate Counsel OCTOBER 24, 2025
mgoicoecheaallen(@idahopower.com IDAHO PUBLIC
UTILITIES COMMISSION
October 24, 2025
Commission Secretary
Idaho Public Utilities Commission
11331 W. Chinden Boulevard
Building 8, Suite 201-A
Boise, Idaho 83714
Re: Case No. IPC-E-24-44
Idaho Power Company's Application for Approval of a Special Contract and
Tariff Schedule 28 to Provide Electric Service to Micron Idaho Semiconductor
Manufacturing (Triton) LLC
Dear Commission Secretary:
Attached for electronic filing, please find Idaho Power Company's Errata to Exhibit
No. 3 of the Surrebuttal Testimony of Grant T. Anderson in regard to the above matter.
Confidential Exhibit No. 3 to the Surrebuttal Testimony of Grant T.Anderson will be
sent in a separate email to the parties who have signed the Protective Agreement.
If you have any questions about the attached documents, please do not hesitate
to contact me.
Sincerely,
n I f9CC� IJI�J(�ivl.
Megan Goicoechea Allen
MGA:cd
Attachments
1221 W. Idaho St(83702)
P.O.Box 70
Boise, ID 83707
MEGAN GOICOECHEA ALLEN (ISB No. 7623)
DONOVAN WALKER (ISB No. 5921)
Idaho Power Company
1221 West Idaho Street (83702)
P.O. Box 70
Boise, Idaho 83707
Telephone: (208) 388-5317
Facsimile: (208) 388-6936
mgoicoecheaallenCa�,idahopower.com
dwalkerCa-)_idahopower.com
Attorneys for Idaho Power Company
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF IDAHO POWER )
COMPANY'S APPLICATION FOR ) CASE NO. IPC-E-24-44
APPROVAL OF SPECIAL CONTRACT AND )
TARIFF SCHEDULE 28 TO PROVIDE ) IDAHO POWER COMPANY'S
ELECTRIC SERVICE TO MICRON IDAHO ) ERRATA TO EXHIBIT NO. 3 OF
SEMICONDUCTOR MANUFACTURING ) THE SURREBUTTAL
(TRITON) LLC. ) TESTIMONY OF GRANT T.
ANDERSON
Idaho Power Company ("Idaho Power" or "Company") hereby respectfully submits
to the Idaho Public Utilities Commission ("Commission") this Errata to Exhibit No. 3
accompanying the Surrebuttal Testimony of Grant T. Anderson ("Anderson Surrebuttal
Testimony")filed on August 29, 2025, in this matter, to ensure accuracy, consistency, and
clarity of the record as follows:
1. While preparing its response to the Second Production Request of the
Industrial Customers of Idaho Power ("ICIP") issued on October 9, 2025, the Company
identified the need to revise and update Exhibit No. 3 accompanying the Anderson
Surrebuttal Testimony as more fully explained below.
IDAHO POWER COMPANY'S ERRATA TO EXHIBIT NO. 3 OF THE SURREBUTTAL TESTIMONY OF
GRANT T. ANDERSON - 1
2. As described on pages 18 and 19 of the Anderson Surrebuttal Testimony,
Exhibit No. 3 presented an updated no-harm analysis using the 2025 Integrated Resource
Plan ("IRP") and Micron FAB's most recent load forecast for a ten-year period (2026-
2035). In preparing a version of Exhibit No. 3 expanded over the twenty-year time frame
as requested in ICIP's Second Production Request, the Company determined that certain
portfolio costs were inadvertently omitted in both the With Micron and Without Micron
scenarios and that the total revenue requirement was understated in both portfolios due
to a discrepancy in the timing of certain revenue requirement.
3. Once it identified these issues, the Company prepared a revised Exhibit No.
3 adjusted as follows and confirmed that the adjustments did not result in a change to
Company's conclusion that the Micron FAB does not increase costs for other customers:
(1) incorporating the associated revenue requirement for 250 MW of battery energy
storage systems and 261 MW of natural gas generation resources that had been
inadvertently omitted from both the With Micron and Without Micron portfolios and (2)
correcting a formulaic error affecting the timing of certain revenue requirement that had
previously understated the total revenue requirement in both portfolios.
4. In addition to the adjustments described above, the Company incorporated
two further updates. First, the embedded demand-classified revenue requirement was
updated to more accurately reflect expected 2026 levels based on pending open dockets.
Second, the load ratio share was revised to rely on Micron FAB's Contract Demand rather
than its load forecast, which more appropriately reflects cost allocation.
5. As a result of these modifications and updates, the Company is providing a
revised version of Exhibit No. 3 with this Errata to replace Exhibit No. 3 filed with the
Anderson Surrebuttal Testimony on August 29, 2025. Revised Exhibit No. 3 does not
IDAHO POWER COMPANY'S ERRATA TO EXHIBIT NO. 3 OF THE SURREBUTTAL TESTIMONY OF
GRANT T. ANDERSON -2
change the conclusions of the no-harm analysis or necessitate any changes to the
testimony itself and is being provided to ensure accuracy, transparency, and clarity of
the record.
Respectfully submitted this 24t" day of October 2025.
Awrt,
I
MEGAN GOICOECHEA ALLEN
Attorney for Idaho Power Company
IDAHO POWER COMPANY'S ERRATA TO EXHIBIT NO. 3 OF THE SURREBUTTAL TESTIMONY OF
GRANT T. ANDERSON - 3
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 24t" day of October 2025, 1 served a true and
correct copy of Idaho Power Company's Errata to Exhibit No. 3 of the Surrebuttal
Testimony of Grant T. Anderson upon the following named parties by the method
indicated below, and addressed to the following:
Commission Staff Hand Delivered
Chris Burdin U.S. Mail
Deputy Attorney General Overnight Mail
Idaho Public Utilities Commission FAX
11331 W. Chinden Blvd., Bldg No. 8 FTP Site
Suite 201-A (83714) X Email
PO Box 83720 Chris.Burdin(a)-puc.idaho.gov
Boise, ID 83720-0074
Industrial Customers of Idaho Power Hand Delivered
c/o Peter J. Richardson U.S. Mail
Richardson Adams, PLLC Overnight Mail
515 N. 27t" Street FAX
Boise, Idaho 83702 FTP Site
X Email peter _richardsonadams.com
Dr. Don Reading Hand Delivered
280 S. Silverwood Way U.S. Mail
Eagle, Idaho 83716 Overnight Mail
FAX
FTP Site
X Email dreading6a mindspring.com
Idaho Irrigation Pumpers Association, Hand Delivered
Inc. U.S. Mail
Eric L. Olsen Overnight Mail
Echo Hawk & Olsen, PLLC FAX
505 Pershing Ave., Ste. 100 FTP Site
P.O. Box 6119 X Email el�echohawk.com
Pocatello, Idaho 83205
Lance Kaufman, Ph.D. Hand Delivered
2623 NW Bluebell Place U.S. Mail
Corvallis, OR 97330 Overnight Mail
FAX
FTP Site
X Email lance aegisinsight.com
IDAHO POWER COMPANY'S ERRATA TO EXHIBIT NO. 3 OF THE SURREBUTTAL TESTIMONY OF
GRANT T. ANDERSON -4
Micron Technology, Inc. Hand Delivered
Austin Rueschhoff U.S. Mail
Thorvald A. Nelson Overnight Mail
Austin W. Jensen FAX
Kristine A.K. Roach FTP Site
Holland & Hart LLP X Email
555 17th Street, Suite 3200 darueschhoff(a-).hollandhart.com
Denver, CO 80202 tnelson(o)_hol land hart.corn
awjensen hollandhart.com
karoach(a)_hol land hart.com
aclee hollandhart.com
Clean Energy Opportunities for Idaho Hand Delivered
Kelsey Jae U.S. Mail
Law for Conscious Leadership Overnight Mail
920 N. Clover Dr. FAX
Boise, ID 83703 FTP Site
X Email kelsey(o)_kelseyiae.com
Courtney White Hand Delivered
Mike Heckler U.S. Mail
3778 Plantation River Drive, Suite 102 Overnight Mail
Boise, ID 83703 FAX
FTP Site
X Email
courtney(o-)_cleanenergyopportunities.com
mike ,cleanenergyopportunities.com
Christy Davenport
Legal Administrative Assistant
IDAHO POWER COMPANY'S ERRATA TO EXHIBIT NO. 3 OF THE SURREBUTTAL TESTIMONY OF
GRANT T. ANDERSON - 5