HomeMy WebLinkAbout20251021Decision Memo.pdf DECISION MEMORANDUM TO: COMMISSIONER LODGE COMMISSIONER HAMMOND COMMISSIONER HARDIE COMMISSION SECRETARY COMMISSION STAFF LEGAL FROM: MICHAEL ELDRED, COMMISSION STAFF JEFFREY LOLL, DEPUTY ATTORNEY GENERAL DATE: OCTOBER 21, 2025 SUBJECT: IN THE MATTER OF INTERMOUNTAIN GAS COMPANY'S TARIFF ADVICE REGARDING REVISIONS TO SECTION C OF GENERAL SERVICE PROVISIONS; TARIFF ADVICE NO. INT-TAG-25-03. BACKGROUND On September 30, 2025, Intermountain Gas Company filed Tariff Advice No. INT-TAG- 25-03 ("Tariff Advice") requesting to revise Section C of its General Service Provisions, Installation and Extension of Natural Gas Mains and Services for Residential and Commercial Customers. The Company's Tariff Advice proposes to update the Allowable Investment Factors ("AIF"), the Service Line Cost per Foot ("SLCPF"), and the construction overhead charges in accordance with Commission Order No. 34735. The Company requests these revisions be approved by November 1, 2025, and to become effective on December 1, 2025. STAFF ANALYSIS Staff reviewed the proposed updates in the Tariff Advice and believes the methods used to update Section C are consistent with the methods approved in Commission Order No. 34735 and that inputs driving the updated amounts are reasonable. Staff recommends the Commission approve the revised tariff sheet reflecting updates to the AIF, SLCPF, and the construction overhead charges with an effective date of December 1, 2025. The Company is required by Commission Order No. 34735 to file an annual tariff advice to update the Allowable Investment Factors, the Service Line Cost per Foot, and the construction overhead charge by October 1, beginning in 2021. Staff reviewed the Company's workpapers DECISION MEMORANDUM - 1 - OCTOBER 21, 2025 and examined the method and the changes in inputs driving the change in the amounts for the three different factors. The Company's methods for updating AIF, SLCPF, and the construction overhead charge in this Tariff Advice are consistent with the methods approved in Commission Order No. 34735. Staff summarized the percentage change for the AIF and SLCPF and the construction overhead charge in Table Nos. 1 and 2, below. When compared to current authorized rates, the Company's proposed AIF increased by 3.0% for both Residential and Commercial service line extension. For main line extensions, the AIF increased by 2.9% for Residential customers and 2.8% for Commercial customers. These rates are based on the service line extension and main line extension costs embedded in base rates that were authorized in the last general rate case through Order No. 35836. From the baseline, the rates are inflated each subsequent year through the annual update using the consumer price index published by United States Bureau of Labor Statistics. The proposed SLCPF is based on actual costs incurred over three years and increased by 14.0% compared to the current SLCPF. Staff believes the major inputs driving the increase in the SLCPF were related to increases in inflation, contract service/consulting, and engineering and supervision costs associated with capital additions due to growth. The proposed construction overhead charges are based on actual costs incurred over the past year. The inputs used to determine the construction overhead charge resulted in 6.6%higher overhead charges (proposed amount of 11.63%) compared to last year's annual update. Staff believes the inputs used to determine all three factors are reasonable and conform with Commission Order No. 34735. Table No. 1: Allowable Investment Factor Comparison Allowable investment factors ($/therm) Customer type Service Main Combined Current Proposed Change Current Proposed Change Current Proposed Change Residential 0.674 0.694 3.0% 0.822 0.846 2.9% 1.496 1.54 2.9% Commercial 0.501 0.516 3.0% 0.612 0.629 2.8% 1.113 1.145 2.9% DECISION MEMORANDUM - 2 - OCTOBER 21, 2025 Table No. 2: Service line Costs and Construction Overhead Charges Comparison Current Proposed Change Service Line Cost per Foot($) 17.33 19.75 14.0% Construction Overhead Charges (%) 10.91 11.63 6.6% RECOMMENDATION Staff recommends the Commission approve the revised tariff sheet reflecting updates to the AIF, SLCPF, and the construction overhead charge with an effective date of December 1, 2025. COMMISSION DECISION Does the Commission wish to authorize the Company's proposed revisions and the submitted revised Section C tariff sheet with an effective date of December 1, 2025? 04C Michael Eldred Commission Staff I:\Utility\UDMEMOS\INT-TAG-25-03 Decision Memo.docx DECISION MEMORANDUM - 3 - OCTOBER 21, 2025