Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Avista 250924 Avista Implementation
IPUC Pipeline Safety Inspection Inspector(s): Brooks Date(s): 250924 Company/Owner: Avista Utilities Unit/OPID: 31232 Standard: ❑ Training: ❑ TIMP/DIMP: ® OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 0.5 Inspection Summary September 24, 2025: (0.5 DIMP Prep) (Brooks 0.5) IPUC inspector Brooks reviewed the answers provided by Avista personnel and observed no discrepancies with the implementation and recordkeeping of the Avista Integrity Management Plan. Corrective Action Required: ❑ Yes N No Compliance Letter#: NA Follow Up Required: ❑ Yes N No By Date: NA Lead Inspector: Brooks Date: Reviewer: Date: 250924 Signature: Signature: IPUC Form 1 Rev. 12/11/2024