Loading...
HomeMy WebLinkAboutEnbridge 250929 IPUC Form 1 - Enbridge Preston Field IPUC Pipeline Safety Inspection Inspector(s): Galli, Green Date(s): 250929 Company/Owner: Enbridge Unit/OPID: 12876 -7 Standard: M Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 2.0 Inspection Summary Audit consisted of IPUC inspectors Galli and Green inspecting field installed equipment for the FL074, Franklin-Preston, Idaho inspection units. The PHMSA IA question set and Enbridge equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. September 29, 2025: (0.5 Standard MG)(0.5 Standard AG) Travelled to Franklin-Preston and met with Enbridge company representatives at the Preston regulator station for an in brief and to begin field audit and reviewed OQ records for all personnel taking part in the inspection. September 29, 2025: (0.5 Standard MG)(0.5 Standard AG) Regulator Stations: 7 regulator stations were inspected for proper operation, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 1 cathodic protection rectifier, 12 emergency/isolation valves were checked for proper operation, observations listed below. An exit interview was performed following the district inspection with field personnel and compliance specialist Justin Berg. Completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. Discrepancies: None. Corrective Action Required: ❑ Yes M No Compliance Letter#: None Follow Up Required: ❑ Yes M No By Date: Lead Inspector: GaIWGreen Date: Reviewer: Brooks Date: 251006 Signature: Signature: '3-5 10 Iq IPUC Form 1 Rev. 12/11/2024