HomeMy WebLinkAboutIntermountain Gas 250916-18 IPUC Form 1 IPUC Pipeline Safety Inspection
Inspector(s): Perkins Date(s): 250916-18
Company/Owner: Intermountain Gas Company Unit/OPID: 08160
(IGC)
Standard: ❑ Training: ❑ TIMP/DIMP: ® OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 2.5
Inspection Summary
September 16, 2025: (1.0)
Traveled from Idaho Falls to the site located at 3868 E 400 N, Rigby, Idaho, following identification of a
potential coating anomaly through a Direct Current Voltage Gradient (DCVG) inspection. Upon
excavation, it was determined that a welded tapping tee exhibited improper wrap application, indicating a
possible holiday in the protective coating. To assess the integrity of the affected area, IGC engaged Acuren
to perform non-destructive testing (NDT) and a comprehensive integrity inspection over a segment
approximately 3 to 4 feet in length. Following completion of the inspection, KV Utilities rewrapped all
exposed sections, ensuring proper bedding and subsequently backfrlled the trench to restore the site.
September 17, 2025: (1.0)
Traveled from Idaho Falls to the site located at 2286-2298 W 1000 S, Rexburg, Idaho, following
identification of a potential coating anomaly through a Direct Current Voltage Gradient (DCVG)
inspection. Upon excavation, it was determined that a 2 spots of tar coating were missing, indicating a
possible holiday in the protective coating. To assess the integrity of the affected area, IGC engaged Acuren
to perform non-destructive testing(NDT) and a comprehensive integrity inspection over a segment
approximately 3 to 4 feet in length. Following completion of the inspection, KV Utilities rewrapped all
exposed sections, ensuring proper bedding and subsequently backfrlled the trench to restore the site.
September 18, 2025: (0.5)
I traveled from Idaho Falls back to Boise, ID and completed form and attached all OQ's and photos to the
file.
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Follow Up Required: ❑ Yes ® No By Date: NA
Lead Inspector: Perkins Date: Reviewer: Brooks Date: