Loading...
HomeMy WebLinkAboutIntermountain Gas 250924 Eagle Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 250924 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 1099 N Gracie Ave City/District: Eagle Contractor/Job#: W012309662 Foreman: Colin Operator Supervisor: None Zimmermann Job Description: 3/" Service Line System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: 2025354021 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 3/" inch dated 07/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand used SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14 gauge observed in trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 3 feet away from electrical 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dig to locate stub IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Observed %" PE butt fusion - Joiner(s) Qualified OPS 309 Observed squeeze off - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate -Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included(1099 N Gracie Ave, Eagle, ID): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of 1/" butt fusions, tracer wire installation, successful pressure test, squeeze off, mechanical fittings (stab fitting), bedding and backfill. Quizzed employees of AOC recognition of squeeze off. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Rcquircd: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 250924 Signature: �_ Signature: �S cm 19 IPUC Form 4 Rev.12/10/2024