Loading...
HomeMy WebLinkAboutIntermountain Gas 250917 Emmett Construction IPUC Construction Inspection Inspector(s): Brooks, Green Date(s): 250917 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 3125 Osage Ln City/District: Emmett Contractor/Job #: WO 12315646 Foreman: (Dasco) Operator Supervisor: None On-Site WO 12315649 J. Maceda Job Description: %" Service line and HPSS install System Type: M GD ❑ GT ❑ GG One-Call Ticket: 2025363280 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT Wax wrap applied OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 370 PSIG for 15 Minutes 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 SAT 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 SAT - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 -Removal of asbestos wrap OPS 402 -Exothermic Welding OPS 403 Additional Comments: Address: 3125 Osage Ln,in Emmett Observations Included: trench depth, EFV installation, safety equipment, tracer wire, line locating, welding, pressure test, wax wrap, verification of OQ records and discussed OQ requirements. A hot tap was not witnessed but performed. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Brooks Date: Reviewer: Date: 250917 Signature: Signature: IPUC Form 4 Rev.12/10/2024