Loading...
HomeMy WebLinkAboutIntermountain Gas 250915 Pocatello Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250915 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: 1002 Samuel St Trailer 91-92 City/District: Pocatello Contractor/Job#: W/O 12273610 Foreman: Operator Supervisor: None J. James Job Description: Abandon %" & 2" Aldy-A pipe, System Type: © GD ❑ GT ❑ GG Run new 3/4" PE Service line off 2" steel main One-Call Ticket: 2025352624 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 3/" inch PE 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches,Boring 42" OPS 322 3. BeddingBackfill OPS 308 SAT Sand used/native soil SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14 gauge bore wire OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 SAT 3/4 & 2" Aldyl-A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Valid dig ticket 21. Plastic Piye OPS 307 SAT Observed completed fusions of - Joiner(s) Qualified OPS 309 PE replacement pipe. Did not - Fusion Tools OPS 325 observe install of PE pipe. - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Site Visit Summary—Pocatello,ID (1002 Samuel St, Trailer 91-92) Travel Date: 15 Sep 2025 Route: Boise to Pocatello Observations Conducted: • Confirmed presence and proper use of required safety equipment. • Reviewed Job Safety Analysis (JSA) documentation for task alignment. • Verified operator qualifications and certifications. • Inspected equipment calibration for compliance and accuracy. • Assessed trench depth and boring operations for adherence to specifications. • Observed tracer wire installation and bedding procedures. • Conducted on-site employee knowledge checks regarding safe digging practices near the main using a backhoe. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250915 Signature: Signature: �.501�9 IPUC Form 4 Rev. 12/10/2024