Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250915 Pocatello Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 250915 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: 1002 Samuel St Trailer 91-92 City/District: Pocatello Contractor/Job#: W/O 12273610 Foreman: Operator Supervisor: None J. James Job Description: Abandon %" & 2" Aldy-A pipe, System Type: © GD ❑ GT ❑ GG Run new 3/4" PE Service line off 2" steel main One-Call Ticket: 2025352624 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 3/" inch PE 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches,Boring 42" OPS 322 3. BeddingBackfill OPS 308 SAT Sand used/native soil SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14 gauge bore wire OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 SAT 3/4 & 2" Aldyl-A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Valid dig ticket 21. Plastic Piye OPS 307 SAT Observed completed fusions of - Joiner(s) Qualified OPS 309 PE replacement pipe. Did not - Fusion Tools OPS 325 observe install of PE pipe. - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Site Visit Summary—Pocatello,ID (1002 Samuel St, Trailer 91-92) Travel Date: 15 Sep 2025 Route: Boise to Pocatello Observations Conducted: • Confirmed presence and proper use of required safety equipment. • Reviewed Job Safety Analysis (JSA) documentation for task alignment. • Verified operator qualifications and certifications. • Inspected equipment calibration for compliance and accuracy. • Assessed trench depth and boring operations for adherence to specifications. • Observed tracer wire installation and bedding procedures. • Conducted on-site employee knowledge checks regarding safe digging practices near the main using a backhoe. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250915 Signature: Signature: �.501�9 IPUC Form 4 Rev. 12/10/2024