HomeMy WebLinkAboutIntermountain Gas 250909.1 Kuna Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250909 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 8494 S Silver Smog Way City/District: Kuna Contractor/Job #: W/O 12280857 Foreman: Operator Supervisor: None H Talamantez Job Description: 3/" Service Line System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025360432 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT %" inch 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Sand used SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge observed in trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Valid dig ticket IPUC Form 4 Rev. 12n0/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Observed completed fusions of%" - Joiner(s) Qualified OPS 309 PE. -Fusion Tools OPS 325 Observed squeeze off - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Site Observations—8494 S Silver Smog Way, Kuna, ID A comprehensive field inspection was conducted at the above location, with the following key elements verified and documented: • Proper use of safety equipment and adherence to Job Safety Analysis (JSA)protocols • Confirmation of operator qualifications and equipment calibration • Verification of trench depth compliance • Inspection of completed 3/"butt fusions, including proper rollback procedures • Installation of tracer wire and appropriate bedding materials • Successful completion of pressure testing • Execution of squeeze-off and backfill operations • Employee knowledge assessed regarding squeeze/release timing procedures All activities and procedures observed were performed in full compliance with the Idaho Gas Company (IGC) Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: P 'ns Date: Reviewer: Brooks Date: 250909 Signature: Signature: .1S oq C_Xq IPUC Form 4 Rev. 12/10/2024