HomeMy WebLinkAboutLower Valley Energy 250806, 24-27 LVE Afton Construction Construction IPUC Construction Inspection
Inspector(s): Galli/Perkins Date(s): 250806/24-27,20250908
Company/Owner: Lower Valley Energy (LVE) Unit/OPID: 31044
Address: Crow Creek Rd City/District: Between Afton,WY and
Montpelier, ID
Contractor/Job#: Foreman: Operator Supervisor:
Todd Lewis Craig Coles
Job Description: Install 12" Transmission Line System Type: ❑ GD ❑X GT ❑ GG
One-Call Ticket: N/A Total Inspection Days: 5.5
Tasks: Procedure# Rating Comments
1. Materials—Handling, Storage, Labeling Unsat Did not follow manufacturer
Instructions on pipe handling
2. Trenching/Boring—Depth, Clearance Sat
3. Bedding/Backfill Sat
4. Pipe Installation(Tracer Wire) Sat
5. Valve Installation N/A
6. Coating Condition N/A
7. Manuals—Field Procedures, O & M Unsat No construction manual provided
8. Testing—Pressure, Duration, Type N/A
9. OQ Qualifications Unsat Expired/No destructive testing
10. Casing Seal/Installation N/A
11. Service Line Installation N/A
12. Tie-In/Hot Tapping N/A
13. Meter Location/Regulator Testing N/A
14. Equipment Calibration Verification Unsat Digital pyrometers are not
calibrated
15. EFV Installation N/A
16. MAOP N/A
17. Purge N/A
18. Safety Equipment N/A
19. Abandonment N/A
20. Line Locating N/A
21. Plastic Pipe Unsat Unqualified individual fusing, non
- Joiner(s) Qualified calibrated pyrometer, dirty heating
- Fusion Tools surface on iron.
- Squeezing
IPUC Form 4 Rev.12/10/2024
IPUC Construction Inspection
- Heat Plate
- Joining Procedure
22. Steel Pipe N/A
-Welder(s) Qualified
Pipe/Coating—Inspected/Repaired
- Cathodic Protection
-Non-Destructive Testing
- Welding Procedures
- Removal of asbestos wrap
- Exothermic Welding
Additional Comments:
August 61h, 2025: Inspector Galli traveled to Afton, WY to conduct construction inspection along Crow
Creek Road towards Montpelier, ID. (Galli 0.5)
Observations included: pipe stringing, material verification, inspection of completed butt fusions, line
markers, operator qualification, equipment qualifications and tracer wire installation in trenches.
Discrepancies:
1. Fusion procedures state 500 degrees +/- 10 degrees in several places.
2. Unable to determine what butt fusion standard they follow in their procedures.
3. Only observed two-line markers along 40 miles of right of way. Need to verify more line markers
will be installed.
August 241h, 2025: Inspector Perkins traveled to Montpelier, ID to conduct construction inspection along
Crow Creek Road on 25-26 August. (1.0)
August 25-26, 2025: Observations included: pipe stringing, material verification, fusing, inspection of
completed butt fusions, spider plowing in pipeline, excavating trenches, bedding/backfilling, using
bulldozer to pre-rip area to be spider plowed, line markers, operator qualification, equipment
qualifications, tracer wire and warning tape installation in trenches. (2.0)
August 271h, 2025: Inspector Perkins traveled to Afton, WY to witness fusion/OQ training for contract
personnel. Traveled back to Boise. (1.0)
September 8, 2025: Compliance/follow-up paperwork. (Perkins 1.0)
Corrective Action Required: ® Yes ❑ No Compliance Letter#: L202501
Lead Inspector: lli/Perkins Date: Reviewer: Brooks Date:
/ 20250908
Signature: �� `' Signature:
2-5 C)
IPUC Form 4 Rev. 12/10/2024