Loading...
HomeMy WebLinkAboutDouglas Pipeline Company 250805 & 250812 IPUC Form 1 - Douglas Records and Field IPUC Pipeline Safety Inspection Inspector(s): Perkins Date(s): 250805 & 250812 Company/Owner: Douglas Pipeline Company Unit/OPID: 31442 (DPC) Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 2.0 Inspection Summary Audit consisted of inspectiny-2024 records for Douglas Pipeline Companv (DPQ August 5,2025: (1.0 Standard) IPUC inspector Perkins conducted a records audit on Douglas Pipeline Company virtually for the Langley-Gulch and Bennett Mountain transmission line segments with Andi Shacklett, Director of Regulatory Compliance. The PHMSA IA question set for the records portion was used as a guide throughout the audit to ensure all areas were completed as they pertain to required records. A complete list of attendees can be found in the IA inspection. No discrepancies were found. August 12,2025: (1.0 Standard Post) Audit consisted of inspecting field installed operating equipment for Douglas Pipeline Companies Langley-Gulch LG (New Plymouth) and Bennett Mountain BMT (Mountain Home) districts. Audit included: 18 CP test station readings, verification of valve functionality(Langley Gulch-V1001, V 1002, V 1003, V 1004) (Bennett Mountain- V 1001, 1002) and ROW line marker inspections. Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Follow Up Required: ❑ Yes ® No By Date: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250908 Signature- Signature: dS 09 IPUC Form 1 Rev. 12/11/2024