Inspector(s): Perkins Date(s): 250805 & 250812
Company/Owner: Douglas Pipeline Company Unit/OPID: 31442
(DPC)
Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 2.0
Inspection Summary
Audit consisted of inspectiny-2024 records for Douglas Pipeline Companv (DPQ
August 5,2025: (1.0 Standard)
IPUC inspector Perkins conducted a records audit on Douglas Pipeline Company virtually for the
Langley-Gulch and Bennett Mountain transmission line segments with Andi Shacklett, Director of
Regulatory Compliance. The PHMSA IA question set for the records portion was used as a guide
throughout the audit to ensure all areas were completed as they pertain to required records.
A complete list of attendees can be found in the IA inspection. No discrepancies were found.
August 12,2025: (1.0 Standard Post)
Audit consisted of inspecting field installed operating equipment for Douglas Pipeline Companies
Langley-Gulch LG (New Plymouth) and Bennett Mountain BMT (Mountain Home) districts.
Audit included: 18 CP test station readings, verification of valve functionality(Langley Gulch-V1001,
V 1002, V 1003, V 1004) (Bennett Mountain- V 1001, 1002) and ROW line marker inspections.
Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9,
IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents.
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Follow Up Required: ❑ Yes ® No By Date: NA
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
250908
Signature- Signature: dS 09
IPUC Form 1 Rev. 12/11/2024