HomeMy WebLinkAboutAvista 250926 Hayden Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 250926-27
Company/Owner: Avista Utilities Unit/OPID: 31232
Address: 1094 E Lacey Ave City/District: Hayden
Contractor/Job#: W/O # 1036496494 Foreman: Operator Supervisor:
D. Beckedahl, On-Site: N
Avista
Job Description: New 3/- %" Service System Type: ❑X GD
One-Call Ticket: 252530053 Total Inspection Days: 2.0
Tasks: Procedure# Rating Comments
1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT
2. Trenching/Boring-Depth, Clearance 3.15 SAT Customer trench, shading
3. Bedding/Backfill 3.15 SAT Bedding/Shading
4. Pipe Installation(Tracer Wire) 3.13 N/A
5. Valve Installation 2.14 N/A
6. Coating Condition 2.12 N/A
7. Manuals-Field Procedures, O & M 1.4 SAT
8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 PSI-10 Min
9. OQ Qualifications 4.31 SAT
10. Casing Seal/Installation 3.42 N/A
11. Service Line Installation 3.16 SAT Connect %" to 1/" riser
12. Tie-In/Hot Tapping 3.32 N/A
13. Meter Location/Regulator Testing 2.22 N/A
14. Equipment Calibration Verification 5.11,14,21 N/A
15. EFV Installation 3.16 SAT 1800
16. MAOP 4.15 N/A
17. Purge 3.17 SAT
18. Safety Equipment GESH 4 SAT Extinguisher
19. Abandonment 5.16 N/A
20. Line Locating 4.13 N/A
21. Plastic Pipe 3.23-25 SAT Lyco fitting
- Joiner(s) Qualified
- Fusion Tools
- Heat Plate
- Joining Procedure
IPUC Form 4 Rev. 12/11/2024
IPUC Construction Inspection
22. Steel Pipe N/A
-Welder(s) Qualified 3.22
Pipe/Coating—Inspected/Repaired 2.12
- Cathodic Protection 2.32
-Non-Destructive Testing 3.12
-Welding Procedures
-Removal of asbestos wrap
- Exothermic Welding
Additional Comments:
Project Location: 1094 E Lacey Ave, Hayden, ID (1)
Site Observations:
• Trenching operations were completed, followed by proper bedding and shading procedures.
• Installation of tracer wire and PE pipe was observed and verified.
• Pressure testing was conducted on the newly installed line.
• Transition from a V main to a %"house line was completed using a Lyco fitting.
• The riser and meter had been previously set, and the supply line was already installed.
• Scope of work involved exposing the existing V stub and connecting the supply line.
• Contractor was questioned regarding appropriate squeeze and release times for PE pipe to ensure
compliance with manufacturer specifications and industry standards.
Avista employees: Grant Williams, Tyler Barber and Carson Snider
27 Sep 2025-Traveled back to Boise, Idaho (1.0)
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
250927
Signature: ;� Signature: 15 oR a-9
IPUC Form 4 Rev.12/11/2024