HomeMy WebLinkAboutAvista 250923-25 Pinehurst-Smelterville Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 250923-25
Company/Owner: Avista Utilities Unit/OPID: 31232
Address: 250 Blue Star Rd,46894 Silver Valley Rd City/District: Pinehurst-Smelterville
Contractor/Job #: W/O # 1036508042, Foreman: Operator Supervisor:
1036474209 M. Smith NPL On-Site: Ryan Sager
Job Description: New 3/4" Service off 2" main,2" main System Type: ❑X GD
extension.
One-Call Ticket: Customer provided trenches, Total Inspection Days: 2.5
20253800007
Tasks: Procedure# Rating Comments
1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT
2. Trenching/Boring-Depth, Clearance 3.15 SAT Customer trench, shading
3. Bedding/Backfill 3.15 SAT
4. Pipe Installation(Tracer Wire) 3.13 SAT
5. Valve Installation 2.14 N/A
6. Coating Condition 2.12 N/A
7. Manuals-Field Procedures, O & M 1.4 SAT
8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 98 PSI-10 Min
9. OQ Qualifications 4.31 SAT
10. Casing Seal/Installation 3.42 N/A
11. Service Line Installation 3.16 SAT Stub for when house is complete
12. Tie-In/Hot Tapping 3.32 N/A
13. Meter Location/Regulator Testing 2.22 N/A
14. Equipment Calibration Verification 5.11,14,21 SAT Gauge and Gas Quality
15. EFV Installation 3.16 SAT 1800
16. MAOP 4.15 N/A
17. Purge 3.17 SAT
18. Safety Equipment GESH 4 SAT Extinguisher
19. Abandonment 5.16 N/A
20. Line Locating 4.13 SAT Hit old/abandoned comm lines
21. Plastic Pipe 3.23-25 SAT Lyco fittings
- Joiner(s) Qualified
- Fusion Tools
- Heat Plate
- Joining Procedure
IPUC Form 4 Rev.12/11/2024
IPUC Construction Inspection
22. Steel Pipe N/A
-Welder(s) Qualified 3.22
Pipe/Coating—Inspected/Repaired 2.12
- Cathodic Protection 2.32
-Non-Destructive Testing 3.12
-Welding Procedures
- Removal of asbestos wrap
- Exothermic Welding
Project Location: 250 Blue Star Rd, Pinehurst, ID
Observations:
• Verified bedding and shading conditions for compliance.
• Inspected installation of tracer wire and polyethylene(PE)piping; confirmed proper tie-in of 3/" PE
service line to 2"main.
• Witnessed successful pressure testing and gas quality verification.
• Observed temporary riser installation.
• Conducted technical review with contractor regarding PE pipe squeeze-off and release timing, as
well as required separation distances between gas lines and adjacent utilities.
Project Location: 46634 Silver Valley Rd, Smelterville, ID (2.0)
Observations:
• Installed approximately 500 feet of 2-inch PE main extension.
• Dewatered trench to maintain safe and dry working conditions.
• Performed trench excavation,pipe bedding, and backfill operations in accordance with standard
specifications.
• Identified and removed imperfections in piping; utilized Lyco couplers to ensure secure and
reliable connections.
NPL employees: Emily Stannard, Brad Killingsworth and Brad Bowerman
Corrective Action Required: ❑ Yes IN No Compliance Letter#: NA
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
250923-25
Signature: Signature: 1509
IPUC Form 4 Rev. 12/11/2024