HomeMy WebLinkAboutAvista 250923-25 Pinehurst-Smelterville Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250923-25 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 250 Blue Star Rd,46894 Silver Valley Rd City/District: Pinehurst-Smelterville Contractor/Job #: W/O # 1036508042, Foreman: Operator Supervisor: 1036474209 M. Smith NPL On-Site: Ryan Sager Job Description: New 3/4" Service off 2" main,2" main System Type: ❑X GD extension. One-Call Ticket: Customer provided trenches, Total Inspection Days: 2.5 20253800007 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT Customer trench, shading 3. Bedding/Backfill 3.15 SAT 4. Pipe Installation(Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 98 PSI-10 Min 9. OQ Qualifications 4.31 SAT 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT Stub for when house is complete 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 SAT Gauge and Gas Quality 15. EFV Installation 3.16 SAT 1800 16. MAOP 4.15 N/A 17. Purge 3.17 SAT 18. Safety Equipment GESH 4 SAT Extinguisher 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT Hit old/abandoned comm lines 21. Plastic Pipe 3.23-25 SAT Lyco fittings - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev.12/11/2024 IPUC Construction Inspection 22. Steel Pipe N/A -Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 -Welding Procedures - Removal of asbestos wrap - Exothermic Welding Project Location: 250 Blue Star Rd, Pinehurst, ID Observations: • Verified bedding and shading conditions for compliance. • Inspected installation of tracer wire and polyethylene(PE)piping; confirmed proper tie-in of 3/" PE service line to 2"main. • Witnessed successful pressure testing and gas quality verification. • Observed temporary riser installation. • Conducted technical review with contractor regarding PE pipe squeeze-off and release timing, as well as required separation distances between gas lines and adjacent utilities. Project Location: 46634 Silver Valley Rd, Smelterville, ID (2.0) Observations: • Installed approximately 500 feet of 2-inch PE main extension. • Dewatered trench to maintain safe and dry working conditions. • Performed trench excavation,pipe bedding, and backfill operations in accordance with standard specifications. • Identified and removed imperfections in piping; utilized Lyco couplers to ensure secure and reliable connections. NPL employees: Emily Stannard, Brad Killingsworth and Brad Bowerman Corrective Action Required: ❑ Yes IN No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250923-25 Signature: Signature: 1509 IPUC Form 4 Rev. 12/11/2024