Loading...
HomeMy WebLinkAboutAvista 250921-22 Hayden Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250921-22 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 4855 E Ohio Match Rd, 7111 W Lancaster City/District: Hayden, Rathdrum Rd and Meyer Rd and No. Wyoming Ave (subdivision) Contractor/Job #: W/O # 1036496867 Foreman: Operator Supervisor: 1036479174, 1036248859 J. Lemmon NPL On-Site: N Job Description: New 3/4" Service, 2" backbone, 4" System Type: ❑X GD backbone One-Call Ticket: Customer provided trenches Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT Customer trench, shading 3. Bedding/Backfill 3.15 SAT Bedding/Shading 4. Pipe Installation(Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 PSI-10 Min 9. OQ Qualifications 4.31 SAT 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 SAT Tested temp gun against ice cold water 31.3 degrees 15. EFV Installation 3.16 SAT 1800 16. MAOP 4.15 N/A 17. Purge 3.17 SAT 18. Safety Equipment GESH 4 SAT Extinguisher 19. Abandonment 5.16 N/A 20. Line Locating 4.13 N/A 21. Plastic Pipe 3.23-25 SAT Lyco fittings and fusing - Joiner(s) Qualified - Fusion Tools - Heat Plate IPUC Form 4 Rev. 12/11/2024 IPUC Construction Inspection - Joining Procedure 22. Steel Pipe N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 -Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: 21 Sep 2025-Traveled to Coeur d'Alene, Idaho for new construction. (1.0) 22 Sep 2025-4855 E Ohio Match Rd, Hayden, ID—Observations: Trenching, Bedding/shading, tracer wire/PE pipe install,pressure test, and riser install. Quizzed contractor on squeeze/release times of PE pipe. 7111 W Lancaster Rd, Rathdrum, ID—Observations: 2"backbone PE pipe install, bedding and backfilling. Quizzed contractor on separation distances between gas line and other utilities in joint trench. Meyer Rd and No. Wyoming Ave(subdivision) Rathdrum, ID—Observations: 4"backbone PE pipe install, bedding and fusing. Quizzed contractor on rough handling times, cool times and inspection of fusing equipment. NPL employees: Curtis Miller and Monte Kusler Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250922 Signature:. G' Signature: IPUC Form 4 Rev.12/11/2024