HomeMy WebLinkAbout20250929Comments_2.pdf The following comments were submitted via PUCWeb:
Name:Yvonna Connor
Submission Time: Sep 28 2025 8:05PM
Email: y.sue.connorCcbgmail.com
Telephone: 208-246-9905
Address: 1399 W Targee St
Boise, ID 83706
Name of Utility Company: ID Power
Case ID: IPC-E-25-16
Comment: "Businesses and corporations should bear the brunt of utility price hikes, as
they have a flexibility in their operations to absorb and reduce their usage and costs.
Residential homeowners and renters have very limited resources and are stretched
already."
--------------------------------------------------------------------------------------------------------
Name: Diana Nielson
Submission Time: Sep 28 2025 9:OOPM
Email: dlnielson75@gmail.com
Telephone: 208-390-3093
Address: 22 Sagebrush
Salmon , ID 83467
Name of Utility Company: Idaho power
Case ID: IPC-E-25-16
Comment: "The Service Charge Fee has gone from $5.00 to $10.00 to recently$15.00
(2025) now the request for it to go to $25.00 is selfish and greedy. That is a 5 fold increase
over the last several years. People on fixed incomes cannot afford this. The disconnect
rate has gone up to new levels in 2020, 2023 and 2024. IdaCorp netted over$298 Million in
2024. My old service fee from August 2023 was$5.00. Google said IDPower had 650,000
customers x$10.00 is $6.5 million dollars if they only each have 1 meter. I also got dinged
$30.00 on my irrigation.
Now the funding of the SWIP N line: the FERC from Idaho PWR was denied, says rate payers
can't be billed for it. Great Basin Transmission had their FERC denied also.Yet LS Power
says NV rate payers have been over billed $640 million in a 2021-22 report I acquired. NV
Energy also has to refund recently an additional$32million and have had the Green Link
Transmission line installation halted for misleading plans. These are all the same players
working with CAISO. When Idaho Power sold the ROW to LS Power our state still had
regulated transmission. Now it's deregulated transmission and pretty much functioning as
a monopoly in distribution and wanting the customers to foot the infrastructure . At
1
Rogerson Idaho in the P&Z meetings Duke Energy Paid Idaho Power to build the
transmission lines, connector, substation, and BESS. Then mentioned Idaho Power would
purchase these from Duke Energy( project names Jackpot Solar and Franklin Solar). The
PURPA for this was approved Dec 2019 to purchase the Solar from these projects. This
Purpa wast approved before all of the CUP's were applied for or approved. LS Power and
Duke Energy co mingled/bought out divisions (for lack of better wording) as companies.
What PPA's did this Solar project fulfill?
Who is paying for the huge build up at MidPoint Substation? Why are they installing so
much BESS there. Bess are very expensive. I know LS Power was paying for part of the
build up for the now Defunct Lava Ridge Wind Turbine Project. Has Idaho Power declared
this income? . Who is backing a SMR for this same area using the EIS from Lava Ridge for
reference. So it's a given LSPower is and CAISO. So is Idaho Power involved?
Recently Jerome County has been a target to approve the CUP's required while the CUP to
cross Twin Falls County is being ignored and CUP for Cassia County has not been applied
for yet. A lot of putting the Cart Before the Horse.
Then we have mines needing infrastructure build up. Is that included in this $199 million
Increase? Perpetua Resources will need infrastructure. A Bill Gates Backed Project.
Then we have Gateway West entering this same Midpoint Substation. Is that project
helping pay for the buildup? We have the same players RMP, Pacificorp, Idaho Power then
add in the CAISO influence adding in more to the mix. All wanting a piece of the $$ pie with
the rate and tax The Service Charge Fee has gone from $5.00 to $10.00 to recently$15.00
(2025) now the request for it to go to$25.00 is selfish and greedy. That is a 5 fold increase
over the last several years. People on fixed incomes cannot afford this. The disconnect
rate has gone up to new levels in 2020, 2023 and 2024. IdaCorp netted over$298 Million in
2024. My old service fee from August 2023 was$5.00. Google said IDPower had 650,000
customers x$10.00 is $6.5 million dollars if they only each have 1 meter. I also got dinged
$30.00 on my irrigation.
Now the funding of the SWIP N line: the FERC from Idaho PWR was denied, says rate payers
can't be billed for it. Great Basin Transmission had their FERC denied also. Yet LS Power
says NV rate payers have been over billed $640 million in a 2021-22 report I acquired. NV
Energy also has to refund recently an addi dollars. The Midpoint Substation is a huge target
for terrorism. It would shut down most of the western states. The globalist investors have
bought up farms all along the Gateway West and West Wide Corridors. All wanting to build
projects to wheel power to areas of need. I hope my prophecy is unfulfilled.
Then we have PPA's for wind projects with Idaho Power from Wyoming that aren't even built
yet. Jackalope Wind contracted for 35 years. Sound like they are waiting for a change in
administration. Same players NexEra that Have sold Arco Wind before it's built.
Idaho does not want to be used as a transmission line criss crossed, abused state like
Wyoming for the benefit of ISO's like CAISO and populated areas. California has destroyed
2
much of their state and wants our water. The SWIP N will directly connect Idaho to
California and southern Nevada to suck our states rate payers dry.
We have Oklo breaking ground at INL. The micro reactor Aalto is still being planned for a
possibility for Idaho Falls Power. The SMR's need built closer to the need. Then all the
transmission lines would not be needed. CAISO can get their power closer to home.
--------------------------------------------------------------------------------------------------------
3