Loading...
HomeMy WebLinkAbout20121116Avista to Staff 11-13.pdfAvista Corp. 41l!. 1411 East Mission P.O. Box 3727 Spokane. Washington 99220-0500 r r E I j Telephone 509-489-0500 Toll Free 800-727-9170 202 NOV 16 AM 10: 25 IDAHO -ç November 15, 2012 UTILITIES CUMMl0 Idaho Public Utilities Commission 472 W. Washington St. Boise, ID 83720-0074 Attn: Karl T. Klein Weldon B. Stutzman Deputy Attorney General Re: Production Request of the Commission Staff in Case Nos. AVU-E- 12-08 and AVU-G-12-07 Dear Mr. Klein and Mr. Stutzman, Enclosed are an original and three copies of Avista's responses to IPUC Staffs production requests in the above referenced docket. Included in this mailing are Avista's responses to production requests 011 - 013. The electronic versions of the responses were emailed on 11/15/12 and are also being provided in electronic format on the CD included in this mailing. If there are any questions regarding the enclosed information, please contact Paul Kimball at (509) 495-4584 or via e-mail at pauLkimballavistacorp.com Sincerely, Paul Kimball Regulatory Analyst Enclosures CC: all parties AVISTA CORPORATION RESPONSE TO REQUESTFOR INFORMATION JURISDICTION: IDAHO DATE PREPARED: 11/09/2012 CASE NO: AVU-E-12-08/AVTJ-G-12-07 WITNESS: Dave DeFelice REQUESTER: IPUC RESPONDER: Karen Schuh TYPE: Production Request DEPARTMENT: Rates and Tariffs REQUEST NO.: Staff-Oil TELEPHONE: (509) 495-2293 REQUEST: Please completely describe the items included in Failed Electric Plant account. RESPONSE: The Failed Electric Plant is included in ER 2059. All of the projects included in this ER are blanket projects for replacement of distribution equipment throughout the year as required due to equipment failure. The Company must replace the equipment to maintain customer load service. Projects have been set up for various areas in our service territory. Since these projects are blankets, the total amount spent in a month transfers to plant-in-service at the end of that month. Included in Staff PR -12-Attachment A are all capital expenditures for ER 2059 from 2007-2011. AVISTA CORPORATION RESPONSE TO REQUEST FOR INFORMATION- JURISDICTION: IDAHO DATE PREPARED: 1-1/09/2012 CASE NO: AVU-E-12-08 / AVU-G-12-07 WITNESS: Dave DeFelice REQUESTER: IPUC RESPONDER: Karen Schuh TYPE: Production Request DEPARTMENT: Rates and Tariffs REQUEST NO.: Staff-012 TELEPHONE: (509) 495-2293 REQUEST: Please provide a schedule by project (including description) and year showing the detailed amounts of Capital Expenditures for Failed Electric Plant for the years 2007, 2008, 2009, 20 10 and 2011. RESPONSE: Please see Staff _PR_012 Attachment A for Capital Expenditures for ER 2059 - Failed Electric Plant for 2007-2011. Avista Corp Detail of Ca for Failed Electric Plant ID • Electric Failed Plant-CDA 324,340 282,571 154,571 180,877 79,963 1,022,323 - Contractor 36,248 14,037 5,201 2,893 151 58,531 _ - Employee Expenses 7,114 2,949 1,589 847 607 13,106 Labor 96,424 90,927 51,279 46,413 31,045 316,088 Labor Adjustments 69,652 25,477 11,564 23 710 16,989 147,392 ..-. . . -, Material 31,767 34,329 28,795 23,228 11,530 129,649 -•• Overhead 52,482 60,063 43,461 34,958 14,837 205,801 Transportation 27,943 53,885 12 681 48 828 4 806 148 142 Vehicle 31 31 c; Voucher 2,680 905 3,585 9070152.0 Electric Failed Plant Kellogg 178,160 182,495 149,986 157,865 61,401 729,907 Contractor 61,689 11,085 6,400 5,425 5,509 90,108 Contributions (5,366) (5 366) •' Employee Expenses 1,837 2,183 2 216 2 973 1 335 10 544 : Labor 50,178 __• 61,004 70,433 71,713 25,036 278,364 Labor Adjustments 7,848 9,551 4,440 6,656 3,569 32,064 Material 10,814 8 241 4,947 1,929 2,250 28,181 Overhead 26,564 30,859 43,914 39,416 13,449 154,202 Transportation 9,755 57,759 23,002 20,712 10,253 121,481 ' .. Vehicle 516 516 Voucher 9,476 1,814 8,525 19,814 Elect Failed Plant-Grangeville 4,972 2,672 1,342 19,718 22,672 51,376 Contractor .. . 57 57 Employee Expenses 36 167 142 119 Labor 1,318 1,306 552 10,351 3,855 17,383 Labor Adjustments 2,389 4,308 6,697 Material 355 77 1,218 . 1,650 Overhead 461 562 384 3,772 3,677 8,857 Transportation 343 412 105 2,981 8,866 12,707 Voucher 2,850 83 630 3,562 Electric Failed Plant-Kanilah 2,031 7,810 7,749 40,093 20,705 78,387 Employee Expenses 93 66 208 92 100 559 Labor 1,309 1,508 3,356 15,292 8,909 30,375 Labor Adjustments 1 3,160 820 3,980 Material 104 37 579 3,312 1,779 5,811 Overhead 274 1,252 2,257 9,539 4,410 17,732 Transportation 251 1,793 1,349 8,697 4,686 16,775 Voucher 3,154 .. . 3,154 Elect Failed Plant-Craigmont 1,966 7,007 4,195 49,992 11,674 74,833 Contractor 23,805 23,805 Employee Expenses Labor 1,499 114 2,751 2,535 192 7,708 43 5,049 348 19,542 Labor Adjustments 3,950 2,512 6,462 Material 149 257 4,295 400 5,102 Overhead 340 1,426 951 6,745 1,082 10,543 Transportation 127 2,568 453 3,296 2,588 9,031 Electric Failed Plant Orofino 14,483 10,749 38,050 121,063 45,362 2129,707 Employee Expenses 87 135 390 2,785 1,209 4,606 Labor 6,729 5,338 17,802 50,760 26,864 107,493 Labor Adjustments . 3,969 3,969 -Material 144 4,675 12,100 1,516 18,435 Overhead 2,286 2,823 9,397 26,947 8,988 . 50,443 Transportation 2,530 2,309 5,785 22,379 6,463 . 39,467 Voucher- 2,850 2,123 322 5,295 Electric Failed Plant-Elk City 10,750 6,246 5,070 54,506 62,787 139,360 Contractor 4,705 3,196 7,901 Employee Expenses 375 36 120 204 735 Labor 6400 3,052 2,647 23,576 27,373 63,048 Labor Adjustments 820 820 Material 66 1,309 3,813 5,188 Overhead 2,403 1,515 848 15:958 17,760 38,484 '-' K. Transportation 1,572 1,643 1,461 8682 9622 22,979 Voucher 48 157 204 Electric Failed Plant Deary 22,390 37,824 61,344 92,598 109,244 323,401 Contractor 1,783 1,783 Employee Expenses 581 383 63 796 608 2,431 Labor 11,149 17,673 28,163 47,153 52,825 156,963 Labor Adjustments 2,100 790 2,890 Material 3,728 4,005 21885 7,717 5,794 24,128 Overhead 4,969 8,028 17,298 20,070 26,503 76,867 Transportation 1,677 7,510 10835 141,289 23514 57,825 Staff-PR-012 Attachment A.xlsx 1 of 2 3,440,031 Vehicle 215 221 436 Voucher 72 S 77 Elect Failed Plant-Sandpoint 340,419 465,157 267,831 230,967 176,484 1,480,859 Contractor 73,256 25,969 12,433 4,941 5,904 122,503 Contributions (3,472) (3,472) Employee Expenses 6,275 4,463 6,508 4,095 2,220 23,562 Labor 104,161 166,333 118,582 95,345 73,839 558,260 Labor Adjustments 26,088 6,549 10,664 9,133 6,687 59,121 Material 37,005 11,100 10,126 16,544 15,342 90,116 Overhead 55,681 94,129 71.171 57,825 43,964 322,771 Transportation 29,182 144,320 38,338 40,791 27,069 279,699 Vehicle 3,947 8,806 10 12,763 Voucher 8,295 3,489 2,293 1,458 15,536 Elect Failed Plant-Lewiston 62,591 98,020 53,079 231,259 49,319 494,269 Contractor 1,908 2,030 40 93,332 97,310 Employee Expenses 543 803 542 1,891 37 3,816 Labor 10,639 28,878 21,325 45,855 12,292 11S,989 Labor Adjustments 35,491 25,595 6,134 20,694 17,954 105,868 Material 2,389 11,810 6,786 20,869 71236 49,090 Overhead 6,386 15,505 11,917 30,225 8,107 72,139 Transportation 2,386 12,041 6,335 14,293 3,693 38,747 Voucher 2,850 1,358 4,101 8,309 Electric Failed Plant-Moscow 41,342 29,356 53,268 160,221 30,671 314,857 Contractor 21.951 21,951 Contributions (104) (104) Employee Expenses 190 172 240 646 289 1,536 Labor 3,962 8,505 19,161 40,200 10,990 82,817 Labor Adjustments 33,471 6,861 10,315 4,727 3,975 59,349 Material 1,108 5,512 3,078 48,087 3,981 61,767 Overhead 1,095 5,293 13,147 35,100 9,548 64,183 Transportation 416 2,791 7,327 9,615 1,888 22,037 Vehicle 222 222 Voucher 1,100 1,100 Elect Failed Plant-Genesee-Id 5,595 21.377 11,442 23,669 6,761 68,844 Contractor 4,309 1,979 6,287 Contributions (17) (17) Employee Expenses 6 33 68 41 80 229 Labor 1,399 2,695 5,568 4,184 2,361 16,208 Labor Adjustments 1,416 3,950 2,460 7,826 Material 2,237 5,276 1,131 5,531 510 14,685 Overhead 1,184 3,732 2,555 5,578 643 13,691 Transportation 769 4,965 705 2,423 706 9,568 Vehicle 367 367 Elect Failed Plant-Tekoa - Id 7,397 691 574 8,662 Labor 3,487 576 252 4,314 Overhead 960 115 238 1,313 Transportation 2,950 85 3,035 Elect Failed Plant-Palouse-Id 5,051 7,100 3,370 11,611 5,017 32,150 Employee Expenses 131 51 147 32 362 Labor 1,988 3,242 1,066 4,638 1,540 12,475 Labor Adjustments 716 790 1,640 3,146 Material 1,612 880 158 2,234 688 5,573 Overhead 906 1,197 514 2,473 654 5,745 Transportation 414 1,729 917 1,095 463 4,617 Voucher 233 233 1,014,092 1,165,781 811,989 1,374,438 682,634 5,048,934 Total Staff_PR012 Attachment A.xlsx 2 of 2 AVISTA CORPORATION RESPONSE TO REQUEST FOR INFORMATION JURISDICTION: IDAHO DATE PREPARED: 11/09/2012 CASE NO: AVU-E-12-08 / AVU-G-12-07 WITNESS: Dave DeFelice REQUESTER: IPUC RESPONDER: Karen Schuh TYPE: Production Request DEPARTMENT: Rates and Tariffs REQUEST NO.: Staff-013 TELEPHONE: (509) 495-2293 REQUEST: Please provide a schedule by project (including description) and year showing the detailed amounts of Capital Expenditures Transmission Minor Rebuilds for the years 2007, 2008, 2009, 2010 and 2011. RESPONSE: Please see Staff_PR_013 Attachment A for Capital Expenditures for ER 2057 - Transmission Minor Rebuilds and ER 2051 —Electric Transmission Plant Storm from 2007-2011. Avista Corp. Detail of Cap Es for Transmission AN Dry Ck-Lo:Rep! Arms 2,232 - 2,232 Material 2,048 2,048 Overhead 184 184 Creek Talbot Min orRebuild .Pry 2,781 647,674 650,455 AFUDC 10 (10) (0) Contractor 1,430 148,537 149,967 xpenses Employee "Expense' 50 3,925 3,974 Labor 50 47,967 48,467 Material 211,047 211,047 Overhead 792 186,892 187,684 Transportation 29,481 29,481 Vehicle 9,573 9,573 Voucher 10,263 10,263 8FC Latch minor rebuild 247,858 247,858 AFUDC 4,656 4,656 Contractor 101,577 101,577 Employee Expenses 58 58 Labor 25,247 25,247 Material 69,408 69,408 Overhead 32,892 32,892 Transportation 13,423 13,423 Vehicle 322 322 Voucher 275 275 115KV Wilbur Tap minor rebld 412 412 Labor 250 250 Overhead 162 162 Chelanstratfordminorrbld 432 412 Labor 250 250 Overhead 162 162 Beacon NE Minor rebuild 29,741 2,588 312,329 AFUDC 631 409 1,040 Contractor 2,297 2,297 Employee Expenses 18 18 Labor 6,172 1,225 71397 Material 6,096 6,096 Overhead 11,370 953 12,324 Transportation 3,158 3,158 Addy DG Minor rebuild 337,656 13,842 351,498 AFUDC 2,692 2,692 Contractor 173,612 1,493 175,104 Employee Expenses 541 541 j Labor 7,743 125 7,868 Material 88,460 88,460 Overhead 57,590 17,518 75,108 Transportation 1,648 1,648 Vehicle 52 S2 Voucher 5,319 (5,293) 25 Beacon F and C Minor rebuild 181,848 181,848 AFUDC 1,505 1,505 Contractor 9,566 9,566 Employee Expenses 12 12 Labor 27,909 27,909 i. Material 40,103 40,103 Overhead 63,479 63,479 j Transportation 39,274 39,274 itind Shawnee Minor rebuild 248,256 309,351 557,607 T AFUDC 2,776 3,730 6,507 Contractor 34,762 191,426 206,188 Employee Expenses 226 226 Labor 18,694 21,220 39,914 •. Material 76,738 10,138 86,876 Overhead 70,801 74,154 144,955 i Transportation 4,099 4,862 8,961 Vehicle 301 301 Voucher 60,085 3,595 63,680 1 of 6 StaffPR_013 Attachment A.xlss Otis PF Minor rebuild 5,987 5,987 AFUDC 165 165 Contractor 1,756 1,756 Labor 973 973 Material 1,295 1,295 Overhead 1,798 1,798 Davenport Tap rebuild 109,567 1091567 AFUDC 2,045 2,045 Contractor 1,602 1,602 Employee Expenses 340 340 Labor 26,393 26.393 Material 32.727 32,727 Overhead 36,819 36,819 Transportation 9,641 9,641 Bridge Ave Transmission 88,730 (88,730) - AFOOC 881 (881) - Labor 288 (288) Overhead 22,319 (22,319) - Voucher 65,242 (65,242) - Bell NE 1151(v minor rebuild 187,291 187,291 AFUDC 3,152 3,151 Contractor 101,016 101,016 Labor 6,666 6,666 Material 61,497 61,497 • Overhead 14,400 14,400 Transportation 559 559 3HT 115kv Minor rebuild •9CE 15,468 15,468 • AFUDC 861 861 Contractor 796 796 Labor 1,840 1,840 • Material 6,819 6,819 Overhead 2,369 2,369 Transportation 2,783 2,783 [ADD KET 115kv Minor Rebuild 7,580 7,580 AFUDC 70 70 Employee Expenses 107 107 Labor 476 •476 Material 5,929 5,929 Overhead 998 998 Lind Shawnee Minr Rebuild Pt 2 757,360 757,360 AFUOC 4,607 4.607 Contractor 419,211 419,211 Employee Expenses 315 315 Labor 8,360 8,360 Material 115,248 115,248 Overhead 43,192 43,192 Transportation 572 572 Vehicle 158 158 Voucher 165,697 165,697 Hatwai Moscow Minor rebuild 921 424,045 55 425,021 AFUDC 153 9,659 9,812 Contractor 48,213 14,278 62,491 Employee Expenses 240 63 303 Labor 613 49,518 50,131 Material (9,593) 134,235 (12,085) 112,556 Overhead 423 136,800 (2,202) 135,021 Transportation 30,589 30,589 Vehicle 6,832 6,832 Voucher 9,326- 7,959 17,286 Grang-NP #2 Minor Rebuild (0) (0) Labor (0) (0) Overhead 0 • • ........ 0 CDAPine Creek 115kv mnr rbld 161,050 161.050 AFUDC 6,916 6,916 Contractor 23,412 23,412 Employee Expenses 144 144 Labor 34,258 34,258 Material 56,014 56,014 Overhead 27,099 27,099 Transportation 13,207 13,207 2 of 6 Staff-PR-013 Attachment A.xlxx I FCDA Rathdrum repair conductor 30,250 30,250 AFUDC 822 822 Contractor 4,144 4.144 Labor 8,402 8,402 Material 4,132 4,132 Overhead 7,877 7,877 Transportation 4,873 4,873 tCDA Pine Crk 115kv Minor rebid - 19,783 19,783 AFUDC 167 167 Labor 2,555 2,555 Material 10,527 10,527 4 Overhead 4,837 4,837 Transportation 1,028 1,028 Voucher 669 669 Pine St Rath 115kv Minor Rebid 222,874 222,874 AFUOC 2,979 2,979 ). Contractor 5,913 5,913 Employee Expenses 132 132 Labor 44,416 44,416 Material 42,284 42,284 Overhead 61,072 61,072 Transportation 34,192 34,192 Vehicle 167 167 Voucher 31,718 31,718 Bronx Cab 115kv minor rebid 191,798 863 192,662 AFUDC 810 810 Contractor 14,770 14,770 Employee Expenses 497 497 Labor 43,025 54 43,080 Material 26,373 26,373 Overhead 56,333 56,333 Transportation 19,694 19,694 Vehicle 8,267 811 9,078 Voucher 22,030 (2) 22,028 Mos Oro PUL 115 Rebuild 23,987 23,987 4 ARJDC 162 162 Labor 6,784 6,784 Material 4,290 4,290 Overhead 7,942 7,942 Transportation 4 808 4,808 Otis PF Minor Rebuild ID 8,431 8,431 AFUDC 45 45 Employee Expenses 107 107 Labor 2,902 2,902 Material 1,225 1,225 Overhead 4,152 4,152 BEN-PIN 115kv Minor Rebuild 99,876 99,876 AFUDC 3,124 3,124 Contractor 41,018 41,018 S Employee Expenses 287 287 ti Labor 15,579 15,579 Material 16,968 16,968 . Overhead 15,682 15,682 Transportation 7,219 7,219 ti CDA Pine Ck 115 Repl 4 Strs 27,120 27,120 AFUDC 272 272 Contractor 2,174 2,174 Labor 3,801 3,801 N Material 14,165 14,165 N Overhead 4,887 4,887 Trnnnrttir,n 1,820 1,820 Staff-PR-013 Attachment A.xlsx 3 of 6 jo •ii Benewah Mosc 230kv Minor Rebid . 309,591 309,591 *r\ AFUOC 5,326 5,326 * : Contractor 27,822 27,822 Employee Expenses 519 519 Labor 47,028 • 47,028 . . Material 56,505 • • $6,505 - Overhead 53,909 53,909 Transportation 23,393 23,393 P , . •• Vehicle 9,620 9,620 • : • Voucher 85,468 85,468 - c4 1 1! 9 • JPE/NEZORO 1151(v rebuild ;j AFUDC 119,576 2,206 119,576 2,206 Employee Expenses 253 253 , Labor 26,057 26057 r Material 44,706 44,706 , Overhead 24,732 24,732 ge Transportation 21 586 21 586 N Voucher 36 36 AN Minor Transmission-uS l(V-WA 609,438 265,221 874,996 649,760 585,250 2,984665 ' Contractor 223,360 66,478 182,078 85,333 25,641 582,890 ' Employee Expenses 2,671 2,180 4,370 3,710 4,362 17,293 : Labor 122,185 129,886 180,083 167,413 230,082 829,649 Material 88,851 20,508 132,714 225,422 143,724 611,219 . Overhead 73,681 85,670 218,427 213,375 117,702 708,855 "4 Transportation 51,725 79,468 78,694 65,052 789 72,494 1,279 347,432 16,395 J Vehicle 7,162 643 40 437 6,523 72,107 (19,898) 17,726 172,611 :3 Voucher Contributions 62 240 (22,435) (160,049) (91 435) (27 760) (301 679) Minor Transmission 115 (V ID 161 470 221 343 349 459 626 503 274 517 1633291 Contractor 25,944 14,241 25,249 66,941 10,352 142,627 Employee Expenses 1851 1737 1 780 5,873 1,636 12,877 Labor 72,874 64,026 84,484 160 883 81 183 463 451 Material 58,560 63,985 69,208 207,803 59,185 458,742 Overhead 48,002 63,855 129,947 155,979 62,782 460,565 -- Transportation 20,831 25,652 43,498 42,626 40,741 173,348 Vehicle 172 7,145 14,554 709 35 22,616 Voucher 71074 14,378 (4,179) 15,331 40,721 73,326 Contributions (73,839) (33,576) (15,083) (29,643) (22,118) (174,259) Moscow 230 115kv substation 23,115 136 23,251 Employee Expenses 1,499 1,499 Labor 32,374 12,374 Material 2,684 2,684 6,275 Overhead 6,275 1 Transportation 284 135 419 Trans-Walla Walla-Wanapum 230 81865 95,517 23,475 505 103,973 232,336 Contractor 3,497 25,208 7,913 36,619 Employee Expenses 2,239 1,984 192 961 5,375 Labor 1,958 13,109 6,316 278 13,606 35,267 Material (0) 34,306 1,661 22,807 58,774 Overhead 956 13,023 4,693 117 15,061 33,850 Transportation 215 4,298 3,950 110 5,564 14,136 Vehicle 1,597 6,664 8,261 Voucher 1,992 38,062 40,054 Noiewstn-Walla Walla 230- Id 33,004 14,417 2,421 49,843 - ' Contractor 23,893 23,891 - -- ________ Employee Expenses 28 230 60 319 Ulm Labor 3,445 6,082 1,516 11,042 32 32 E.c Material Overhead 4272 6,215 652 11,138 Transportation 698 1 859 193 2 750 Voucher 668 668 No Lewstn Walla Walls 230 Wa 65,334 88,343 4,783 7,521 8,357 174,338 / Contractor 29 181 320 29,500 Employee Expenses 597 751 280 73 5,816 1421 63,188 ;t5 Labor 15,887 41,206 •___________ Material 4,279 4,475 1,688 4,951 329 15,723 Overhead 8,731 22,301 957 1,769 770 34,529 Transportation 2,659 14,487 • 201 1,370 18,716 -p Voucher 4,000 5,123 2,137 11,260 230- Id 2,950 37,951 38,845 34,166 8,511 122,422 Contractor 1,069 2,931 3,999 jTrans-Beacon-Lolo Employee Expenses 162 52 19 233 Labor 538 11,492 9,638 2,225 3,867 27,760 L Material 1,689 3,564 6,737 21,042 33,031 'tWWt4 Overhead 536 6,115 13,992 7,129 1,957 29,729 Staff-PR-013 Attachment Axlsx 4 of 6 0OSO)AII Transportation 187 4,554 8,426 820 2,687 16,673 Voucher 10,996 10,996 Cr #1230 - Id 3,876 39,711 43,586 Contractor 4,562 4,562 Employee Expenses 898 898 0F Labor 1,854 11,150 13,003 Material 288 288 Overhead 948 10,909 11857 Transportation 1,074 11904 12978 Trans Hatwai No Lewiston 230 13,149 17,027 15,381 45 557 Employee Expenses 230 121 225 576 " Labor 8,991 7,308 8,528 24,827 iJ ,ti Material 322 2 602 (1,513) 1,412 Overhead 2,518 5,415 4,967 12,900 Transportation 1,088 1,582 3,174 5,844 Trans-Lolo-Oxbow 230- Id 9,801 4,467 32,180 5,647 52,096 Contractor 3,630 3,630 Expenses 290 184 473 Labor 3,561 1,330 14,137 1,587 20,616 Material 57 355 552 616 1,580 ! Employee Overhead 1,210 1,458 14,623 2,358 19,649 Transportation 1,038 1,323 2,683 1,087 6,131 Voucher 16 16 Trans-Lob-Oxbow 230- Or 2,475 360 2,835 Labor 1,108 160 1,268 Overhead 962 140 1,102 Transportation 405 61 466 :TransBeaCoflLolo 230 Ky - Wa 21,652 6,515 12,235 82,792 282 123,477 ' Employee Expenses 56 437 493 S Labor 3,839 115 1,510 49,230 254 54,949 Material 13,506 4,971 6,066 24,543 Overhead 2,860 1,374 4,035 11,156 28 19,454 Transportation 1,446 623 20,569 22638 1,400 Voucher 1,400 'iTrans 81k-Beacon-Cabinet 230 6,227 15,868 22,095 Labor 2,410 4,129 6,538 Material 1,429 3,868 5,297 Overhead 2,388 6,799 9,187 Transportation 1,072 1,072 Cabinet Gorge-Noxon 230- Id 1,312 6,188 7,501 Labor 2,800 2,800 Material 987 772 1,759 Overhead 326 1,609 1,934 Transportation 995 995 Vehicle 23 13 !Trans-HotsprIngs #2-Noxon 230 1,251 18,868 3,823 23,942 Contractor 2,469 2,469 Labor 7,316 7,316 Material 1,144 2,458 607 4,210 Overhead 107 5,430 747 6,284 Transportation 3,663 3,663 Cabinet Gorge-Noxon 230- Mt 8,657 9,452 18,109 Labor 4,722 4,722 ti Material 6,509 6,509 Overhead 2,248 2,070 4,218 Transportation 2,659 2,659 No. Lewiston-Shawnee 230- Wa 2,095 8,130 1,360 557 42,444 54,587 Contractor 726 42,776 42,502 Employee Expenses 10 157 167 Labor 480 4,463 360 180 5,483 Material 323 . 323 Overhead 298 2,668 438 233 668 4,305 Transportation 191 378 563 144 1,275 Vehicle 445 445 Voucher 69 19 88 Moscow 230kv Relay replacement 433 433 Labor 132 132 5' Material 155 Overhead 146 146 345O10O Trans-Benewah-Pine Cr 230 339 2,210 4,295 723 7,567 Contractor 133 922 1,055 Employee Expenses 57 57 Labor 111 979 1,808 303 3,199 Material 103 103 Overhead 80 1,001 1,050 275 2,405 Transportation 148 98 357 146 749 5 of 6 Staff_PR_013 Attachment A.xlsx Rathdrum 230 Substation (75,972) 78,853 2,881 (3,027) Overhead 5,909 2 881 Voucher MIRA,Trans Bell Westside Coulee 230 (72,945) 72,945 10,194 - 10,194 Labor 6,214 6,214 Overhead 764 764 Transportation 3,216 3,216 M. iTrans-Benewah-Shawnee 230 2,741 2,713 (418) 1,324 6,361 Labor 2,100 74 1,200 3,374 Material 385 (581) (196) Overhead 227 56 (156) 124 251 Transportation 30 84 319 432 • . Voucher 2,500 2,500 • Trans-Noxon-Pine Cr230- Mt 339 59,590 59,929 Employee Expenses 423 423 . Labor 20,364 20,364 - Material 339 (37) 302 Overhead 4,183 4,183 Transportation 34,614 34,614 Voucher 43 43 Noxon Rapids 230kv Switchyard 2,894 2 894 & Labor 1,394 1,394 _ Material (393) (393) 1,893 I__4' Overhead 1 893 Shawnee 230 Failed SGR 52 RAI, Labor 2 120 254 2 374 IN-, 274 146 421 Material 1,510 1510 443 Overhead 336 107 Warden 115kv Failed SGR 52 - • Material - - Repair MidC 4807 12,972 12,972 S,557 Labor 5,557 p Material 3451 3,451 • 4 Overhead 2,135 2,135 Transportation 1,830 1,830 Repair MidC 4 2 07 9,385 9,385 Labor P.Material 4,572 2,019 4,572 2,019 V. 601 1 1 601 HN Overhead Transportation 1,193 1,193 Stafford 115kv Sw Station PRTU 2,722 2,722 Labor 160 160 Material 1,773 1773 Overhead 789 789 ___________ ITrans-Beacon-Bell #5230 489 1,434 1,923 Labor 318 318 Overhead 171 204 1,230 375 1,230 Voucher 1034 0 Westside 230 115kv RD 9 relay 1,034 Labor 309 309 464 Material 464 261 •_'j Overhead 261 - • Les Schwab Transmission wrk Contractor 1,044 • 1,044 Employee Expenses • • 16 16 Labor 7,899 7,899 Material 10,359 • 10,359 Overhead 15,149 15,149 Transportation 5,305 5,305 Voucher 13,499 • 13,499 Contributions (53,270 (53,270) Trans Blk-Beacon-Bell #4 230 • • • • • (17,894) (17,894) s Overhead (4470) (4470) &'1 Voucher (13424) (13424) No Lewiston Shawnee 230 Id 272 272 Labor 144 144 Overhead 68 68 •.••,••. 60 . 60 1,419,743 2,206,328 3,053,183 2,464,783 10,465,101 6 of 6 Staff-PR-013 Attachment A.xlsx