Loading...
HomeMy WebLinkAboutNorthwest Gas Processing 250825 IPUC Form 1 NWGP Records IPUC Pipeline Safety Inspection Inspector(s): Galli, Brooks Date(s): 250825 Company/Owner: Unit/OPID: 39370 Northwest Gas Processing NWGP Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 2.0 Inspection Summary August 25, 2025: (2.0 Standard) (Galli 1.0) (Brooks 1.0) IPUC Inspectors Galli and Brooks of the Idaho Public Utilities Commission met with NWGP compliance and operations personnel in New Plymouth, ID to review records for the previous years of 2023 & 2024. NWGP procedures and records were reviewed and compared to the PHMSA Inspector Assistant(IA) question set. A complete list of attendees can be found in the IA inspection. Completed IPUC Form 1 and the Post-Inspection Written Preliminary Findings were sent to Randy Shelton of Shelton Regulatory Compliance. Discrepancies: No annual review in the Operations and Maintenance Manual for 2024 was found. There were no changes made in 2024. Discussed as a concern with compliance personnel. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Follow Up Required: ❑ Yes ® No By Date: Lead Inspector: Galli Date: Reviewer: Brooks Date: 08/25/2025 Signature: Signature: IPUC Form 1 Rev. 12/11/2024