HomeMy WebLinkAboutIntermountain Gas 250728-30 IPUC Form 1 IGC Transmission Records IPUC Pipeline Safety Inspection Inspector(s): Brooks Date(s): 250814 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 2 Inspection summary July 8, 9, 10 2025: (1.5 Standard Prep) Inspector Brooks conducted a transmission records audit of Intermountain Gas Company(IGC). IGC OPS procedures and records were reviewed and compared to the PHMSA Inspector Assistant (IA) question set. August 14,2025: (0.5 Standard) Records for the previous years of 2023 & 2024 were reviewed with IGC compliance and engineering personnel. A complete list of attendees can be found in the IA inspection. Completed IPUC Form 1 and the Post-Inspection Written Preliminary Findings were sent to Colby Lundstrom, Manager of Operations Compliance. Discrepancies: It was identified that in Bancroft, Idaho, in April of 2025, twenty-three separate HPSS had unsatisfactory line markers as follows: 48825-HPSS-64762, 48825-HPSS-66102, 48825-HPSS-66131, 48825-HPSS-66133, 48825-HPSS-66552, 48825-HPSS-66636, 48825-HPSS-66639, 48825-HPSS-66894, 48825-HPSS-66897, 48825-HPSS-66898, 48825-HPSS-66900, 48825-HPSS-66918, 48825-HPSS-66928, 48825-HPSS-66929, 48825-HPSS-66931, 48825-HPSS-66933, 48825-HPSS-66936, 48825-HPSS-66937, 48825-HPSS-66941, 48825-HPSS-66942, 48825-HPSS-66952, 48825-HPSS-66965, 48825-HPSS-69655. However, IGC patrol records showed that all Pocatello district line markers were marked as Acceptable. No methodology from System Integrity during the audit window existed to properly identify gathering classifications. NCR non-conformance report#QIS 5183 was provided which was to create Form 23093 for analysis. Records did not properly document any methodology that IGC used to identify and classify Type A, B, C, and R gathering pipelines correctly and within required timeframes during the audit window. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202509 Follow Up Required: ® Yes ❑ No By Date: October 4, 2025 Lead Inspector Brooks Date: Reviewer: Date: Signature: Q-509O� Signature: IPUC Form 1 Rev. 12/11/2024