HomeMy WebLinkAboutIntermountain Gas 250902 IPUC Form 1 - IGC Damage Prevention IPUC Pipeline Safety Inspection
Inspector(s): Brooks Date(s): 250902
Company/Owner: Intermountain Gas Company Unit/OPID: 08160
Standard: ❑ Training: ❑ TIMP/DIMP: ❑ OQ: ❑
Incident: ❑ Damage Prevention: N Drug &Alcohol: ❑ Inspection Days:5
Inspection Summary
September 2, 2025: (.5 Damage Prevention) (Brooks 0.5)
IPUC inspector Brooks met with IGC damage prevention manager virtually.
Topics covered:
1. Picarro (AMLD)update. Media statement was to be made by IGC. Leak information to be followed
up with manpower and graded/addressed appropriately. Odd vehicle, anticipate reports from
community. Nighttime surveys. Wind considerations and proximity considerations discussed. Boise
district to start. Expand to other districts.
2. Discussion on Damage Prevention
3. Manager from IGC applied to the Damage Prevention Board.
4. Discussed Part D of annual reports, operator evaluation.
5. Identification of patterns and Bad Actors discussed.
6. Brooks briefed Commissioner Hardie and staff
Corrective Action Required: ❑ Yes N No Compliance Letter#: NA
Follow Up Required: ❑ Yes N No By Date: NA
Lead Inspector: Brooks Date: Reviewer: Date:
250903
Signature: Signature:
IPUC Form 1 Rev. 12/11/2024