Loading...
HomeMy WebLinkAboutIntermountain Gas 250714-250715 IPUC Form 1 - Twin Falls Field IPUC Pipeline Safety Inspection Inspector(s): Brooks, Gatti Date(s): 250714-250716 Company/Owner: Intermountain Gas Company Unit/OPID: 08160 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 5.5 Inspection Summary Audit consisted of IPUC inspectors Brooks and Galli inspecting field installed equipment for the Twin Falls, Idaho inspection units. The PHMSA IA question set and IGC equipment listing were used as a guide throughout the audit to ensure all areas were completed/covered. July 14-15, 2025: (2.0 Standard MG)(2.0 Standard JB) Travelled to Twin Falls and met with IGC company representatives in the Twin Falls district office for in brief and to begin field audit and review OQ records for all personnel taking part in the inspection. Regulator Stations: 21 regulator stations were inspected for proper operation, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 18 casing-to-carrier isolation checks, 4 cathodic protection rectifiers, 13 pipeline patrols, 27 emergency/isolation valves and 40 HPSSs were checked for proper operation, observations listed below. An exit interview was performed following the district inspection with field personnel of Intermountain Gas Company and MDU Compliance Manager Colby Lundstrom. Discrepancies: Pipeline Patrol (Water Crossing) 48569-PP-13982 - Within a quarter of an inch from the wing wall. WO12282086 created. Valve 48567-VLV-35960 - Added carsonite Valve 48567-VLV-35958 -Needs carsonite and trim vegetation for easier access Valve 48567-VLV-36060 - Added carsonite HPSS 48573-HPSS-69668 - WO13233666 for vehicle protection, WO12233669 for markers/stickers HPSS 48573-HPSS-68731 - WO12250132 for markers/stickers July 16, 2025: (1.0 Standard MG)(0.5 Standard JB) Travelled back to Boise. Completed and attached audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. IPUC Form 1 Rev. 12/11/2024 IPUC Pipeline Safety Inspection Corrective Action Required: ❑ Yes ® No Compliance Letter#: NONE Follow Up Required: ❑ Yes ® No By Date: Lead Inspector: Galli Date: Reviewer: Brooks Date: as 0 Signature: � - -� 250716 Signature: 7 �— IPUC Form 1 Rev. 12/11/2024