Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250731 Meridian Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 250731 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Adjacent to 3505 S Linder Road City/District: Meridian Contractor/Job#: W012251169 Foreman: Operator Supervisor: None Rodrigo Puentes Job Description: 4" Main Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025303151 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 4 inch dated 08/2024 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 48 inches,Bore depth is 17 feet OPS 322 under Williams Pipeline 3. Bedding/Backfill OPS 308 SAT Observed partial bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14 gauge observed in trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O &M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Current dig ticket IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Observed completed fusions of 4" - Joiner(s) Qualified OPS 309 PE. Observed Butt fusion process. - Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A = Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (Adjacent to 3505 S Linder Road, Meridian, ID): Safety equipment, verified proper operator qualifications, boring, verified equipment calibration, correct trench depth, verified proper rollback on completed 4"butt fusions and tracer wire installation. Observed the crew properly identify an AOC and cut out a fuse due to shavings in the rollback. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brook Date: 250731 Signature: / ��' Signature: IPUC Form 4 Rev. 12/10/2024