HomeMy WebLinkAboutIntermountain Gas 250709-10 Hailey Construction IPUC Construction Inspection
Inspector(s): Perkins Date(s): 250709-11
Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160
Address: 1528 Quigley Farm Rd, 1140 CD Olena City/District: Hailey
Drive, 404 Bluebird Ct
Contractor/Job: 12249320,12264341, Foreman: Operator Supervisor: None
12202789 L. Hawkins
Job Description: 3/4 Service Line(s) System Type: ® GD ❑ GT ❑ GG
One-Call Ticket: 2025263771, 2025273559, 2025252761 Total Inspection Days: 2.5
Tasks: Procedure# Rating Comments
1. Materials—Handling, Storage, Labeling OPS 11 SAT
2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches
OPS 322
3. Bedding/Backfill OPS 308 SAT 6" sand bed, 6" sand backfill and
SF 418 backfilled with dirt from trench
4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge
OPS 322
5. Valve Installation OPS 703 N/A
6. Coating Condition OPS 401 SAT
OPS 403
7. Manuals—Field Procedures, O &M SAT
8. Testing—Pressure, Duration, Type OPS 505 N/A 98 PSI-15 Min
9. OQ Qualifications OPS 800 SAT Verified
10. Casing Seal/Installation OPS 325 N/A
11. Service Line Installation OPS 302 SAT
12. Tie-In/Hot Tapping OPS 600 N/A
13. Meter Location/Regulator Testing OPS 302 SAT 425 Meter bar
14. Equipment Calibration Verification OPS 501 SAT Verified
15. EFV Installation OPS 301 SAT 1200
16. MAOP OPS 602 N/A
OPS 606
OPS 900
OPS 1000
17. Purge OPS 603 SAT
18. Safety Equipment SF 418 SAT JSA/Extinguishers
SF 422
19. Abandonment OPS 607 1 N/A
IPUC Form 4 Rev. 12/10/2024
IPUC Construction Inspection
20. Line Locating OPS 611 SAT Hand dug irrigation and electrical
21. Plastic Pine OPS 307 SAT Stab fittings, fusing, met fit tee
- Joiner(s) Qualified OPS 309
- Fusion Tools OPS 325
- Squeezing OPS 800
- Heat Plate
- Joining Procedure
22. Steel Pine OPS 200 N/A
-Welder(s) Qualified OPS 201
Pipe/Coating—Inspected/Repaired OPS 202
- Cathodic Protection OPS 306
-Non-Destructive Testing OPS 401
-Welding Procedures OPS 407
- Removal of asbestos wrap OPS 402
- Exothermic Welding OPS 403
Additional Comments:
Observations Included: 1528 Quigley Farm Rd, Line locating, correct trench depth, safety equipment,
verification OQ records, verification equipment calibrations, stab fittings, fusing, met fit tee, tracer wire,
bedding/backfilling, and setting riser. All observed procedures were completed in accordance with IGC
Operations and Maintenance Manual. Asked AOC questions as it pertains to squeeze/release times and
rough handling.
Observations Included: 1104 CD Olena Drive, Line locating, correct trench depth, safety equipment,
verification OQ records, verification equipment calibrations, stab fittings, fusing, tracer wire,
bedding/backfilling and setting riser. All observed procedures were completed in accordance with IGC
Operations and Maintenance Manual. Asked AOC questions as it pertains to squeeze/release times and
rough handling and stab fittings.
Observations Included: 404 Bluebird Ct, Line locating, crew was unable to locate the service stub after
digging for 4 hours.
I traveled from Twin Falls to Boise and completed all forms. (I I July)
Corrective Action Required: ❑ Yes ® No Compliance Letter#:
Lead Inspector: Perkins Date: Reviewer: Brooks Date:
2507011
Signature-; Signature: 3-50717
IPUC Form 4 Rev. 12/10/2024