Loading...
HomeMy WebLinkAboutIntermountain Gas 250707-08 Ketchum-Hailey Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250707-8 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 106 Sunrise Circle (Ketchum) 260 San City/District: Ketchum-Hailey Badger Dr (Hailey) Contractor/Job: 12212769, Foreman: Operator Supervisor: None 12211413 L. Hawkins Job Description: 3/4 Service Line(s) System Type: X❑ GD ❑ GT ❑ GG One-Call Ticket: 2025270236, 2025263773 Total Inspection Days: 2.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inches OPS 322 3. Bedding/Backfill OPS 308 SAT 6" sand bed, 6" sand backfill and SF 418 backfilled with dirt from trench 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT OPS 403 i 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A 98 PSI-15 Min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 425 Meter Bar 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT JSA/Extinguishers SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dug irrigation and electrical 21. Plastic Pipe OPS 307 SAT Stab fittings,fusing - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: I traveled from Boise to Ketchum for construction. Observations Included: 7-8 July 105 Sunrise Circle, Ketchum, ID, Line locating, correct trench depth, Safety equipment, verification OQ records, verification equipment calibrations, stab fittings, tracer wire, bedding/backfilling, and setting riser. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Questioned squeeze/release times and pipe temperature limitations. Observations Included: 8 July, 260 San Badger Dr, Hailey, ID, Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, stab fittings, fusing, tracer wire, bedding/backfilling, and setting riser. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Questioned squeeze/release times and pipe temperature limitations. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250707-8 Signature Signature: a 7 7 IPUC Form 4 Rev.12/10/2024