Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250625 Middleton Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 250625 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 273 and 241 Lightning Ave City/District: Middleton Contractor/Job #: W012246615 Foreman: Operator Supervisor: None W012246612 B. Fritzmeier Job Description: 3/" Service Line System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2025251640 2025251635 Total Inspection Days: 1 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT Dated 01/2025 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 24 inch and 18 inch OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14 gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 SAT 98 psi for 15 minutes 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT Verified separation 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT Riser at least 3 feet from above round electrical conduit 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Cleaning purge 18-. Safety Equipment SF 418 SAT JSA and Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to locate stub 21. Plastic Pipe OPS 307 SAT Butt Fusion - Joiner(s) Qualified OPS 309 Squeeze Off - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included (273 Lightning Ave, Middleton, ID): Signed the JSA, safety equipment, verified proper operator qualifications, verified equipment calibration, line locating, hand dig to locate stub, correct trench depth, 3/"butt fusion, tracer wire installation, proper riser placement, bedding,pressure testing, EFV 1200 installation, squeeze off, mechanical fittings (coupler),backfill and continuity testing. Quizzed employee on AOCs of butt fusion, squeeze off, and pressure testing. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Observations included (241 Lightning Ave, Middleton, ID): Signed the JSA, safety equipment, verified proper operator qualifications, verified equipment calibration, line locating, hand dig to locate stub, correct trench depth and 3/"butt fusion. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 250625 Signature: C Signature: ,/ a5074 IPUC Form 4 Rev.12n0/2024