Intermountain Gas 250624 Ammon Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 250624 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 08160 Address: V Street& N 25th City/District: Ammon Contractor/Job: W/O 12088865 Foreman: Operator Supervisor: None J. Baird Job Description: 4" Main & 2" Tie over to service main System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025254439 Total Inspection Days: 0.5 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation (Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A Did not observe 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT JSA/Extinguishers SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dug and potholing IPUC Form 4 Rev. 12n0/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT Electrofusion - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 -Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations Included: (l" Street &N 25th, Ammon, ID) Line locating, safety equipment, verified OQ records/equipment calibrations, electrofusion, tracer wire, hand digging/potholing to find other utilities and boring. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 250624 ,4 C O.70 c6 Signature- j Signature: d-� IPUC Form 4 Rev. 12/10/2024