Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 250623 Idaho Falls Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 250623 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 1600 S. 25th E Bldg. 7 City/District: Idaho Falls Contractor/Job#: 12154170 Foreman: Operator Supervisor: None B. Miller Job Description: 2" Service Line(s) System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025250485 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 36 inches OPS 322 3. Bedding/Backfill OPS 308 SAT 6" sand bed, 6" sand backfill and SF 418 backfilled with dirt from trench 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A Did not observe 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT JSA/Extinguishers SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dug irrigation and electrical IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT fusing - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Traveled from Boise to Idaho Falls for construction. Observations Included: (1600 S. 251h E Bldg. 7, Idaho Falls, ID) Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, fusing, tracer wire, bedding/backfilling, and setting riser. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No 1 Compliance Letter#: Lead Inspector: P rkins Date: Reviewer: Brooks Date: 250623 Signature: Signature: IPUC Form 4 Rev. 12/10/2024