HomeMy WebLinkAboutIntermountain Gas 250623 Idaho Falls Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250623 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 08160 Address: 1600 S. 25th E Bldg. 7 City/District: Idaho Falls Contractor/Job#: 12154170 Foreman: Operator Supervisor: None B. Miller Job Description: 2" Service Line(s) System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2025250485 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 36 inches OPS 322 3. Bedding/Backfill OPS 308 SAT 6" sand bed, 6" sand backfill and SF 418 backfilled with dirt from trench 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 SAT OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A Did not observe 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT JSA/Extinguishers SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Hand dug irrigation and electrical IPUC Form 4 Rev. 12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT fusing - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Traveled from Boise to Idaho Falls for construction. Observations Included: (1600 S. 251h E Bldg. 7, Idaho Falls, ID) Line locating, correct trench depth, safety equipment, verification OQ records, verification equipment calibrations, fusing, tracer wire, bedding/backfilling, and setting riser. All observed procedures were completed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No 1 Compliance Letter#: Lead Inspector: P rkins Date: Reviewer: Brooks Date: 250623 Signature: Signature: IPUC Form 4 Rev. 12/10/2024