Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Avista 250610-11 Athol Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 250610-11 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 7772 E Autrey Lane City/District: Athol Contractor/Job #: W/O # 1036373946 Foreman: Operator Supervisor: J. Lemmon On-Site: Y- Lance Crawford Job Description: New 3/4" Service. System Type: ❑X GD One-Call Ticket: 251550104 Total Inspection Days: 1.5 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT 3. Bedding/Backfill 3.15 SAT 4. Pipe Installation (Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 SAT 7. Manuals-Field Procedures, O & M 1.4 SAT 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 102 PSI-60 Min 9. OQ Qualifications 4.31 SAT 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 SAT 14. Equipment Calibration Verification 5.11,14,21 SAT Dates in file 15. EFV Installation 3.16 SAT Part of Lyco bolt on tapping tee 16. MAOP 4.15 N/A 17. Purge 3.17 N/A 18. Safety Equipment GESH 4 SAT Extinguisher 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT 21. Plastic Pipe 3.23-25 SAT Lyco fittings - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev. 12i11/2024 IPUC Construction Inspection 22. Steel Pipe N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 - Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: - 7772 E Autrey Lane—Observations: Excavating, bedding/shading, back-fill, 240' of tracer wire/PE pipe install, meter install/test, tie-in to 2"main with bolt on tee and tapped, pressure test and tested gas percentage 94%. Quizzed contractor on AOC's pertaining to tapping tee, excavating near pipe stub and pressure testing. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Perkins Date: Reviewer! goo S Date: 250611 Signature Signature: IPUC Form 4 Rev. 12/11/2024