Loading...
HomeMy WebLinkAboutIntermountain Gas 250529 Boise IGC Construction Construction IPUC Construction Inspection Inspector(s): Brooks Date(s): 250529 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 3708 N Jackie Ln City/District: Boise Contractor/Job #: WO 12189380 Foreman: (Dasco) Operator Supervisor: None On-Site K.Hale Job Description: 3/" Service install System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2025201436 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials—Handling, Storage, Labeling OPS 11 SAT 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 403 7. Manuals—Field Procedures, O & M SAT 8. Testing—Pressure, Duration, Type OPS 505 N/A Not Witnessed 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 1200 EFV 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT IPUC Form 4 Rev.12/10/2024 IPUC Construction Inspection 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Address: 3708 N Jackie Ln Observations Included: trench depth,backfilling, line squeeze, EFV installation, safety equipment, tracer wire, line locating, verification of OQ records and discussed OQ requirements. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Brooks Date: Reviewer: Date: 250529 Signature: I Signature: IPUC Form 4 Rev. 12/10/2024