Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Avista 250604 Athol Construction
IPUC Construction Inspection Inspector(s): Perkins/Brooks Date(s): 250604 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 24903 N Old Highway 95, 32179 N Leornard City/District: Athol loop Contractor/Job #: W/O # 1036356511, Foreman: Operator Supervisor: 1035309947 K. Bridges On-Site: N Job Description: New 3/4" Service. System Type: ® GD One-Call Ticket: 251420063, 251500045 Total Inspection Days: 1.0 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT 3. BeddingBackfill 3.15 SAT 4. Pipe Installation(Tracer Wire) 3.13 SAT 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 SAT 7. Manuals-Field Procedures, O & M 1.4 SAT 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 PSI-10 Min 9. OQ Qualifications 4.31 SAT 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 SAT Tested meter 7.0 Flow, 7.5 Lockup 14. Equipment Calibration Verification 5.11,14,21 SAT 15. EFV Installation 3.16 SAT 16. MAOP 4.15 N/A 17. Purge 3.17 N/A l 18. Safety Equipment GESH 4 SAT ` Extinguisher 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT 21. Plastic Pine 3.23-25 SAT Lyco fittings - Joiner(s) Qualified - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Rev.12/11/2024 IPUC Construction Inspection 22. Steel Pipe N/A -Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 -Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: - 24903 N Old Highway 95-Observations: Bedding/shading,partial back-fill, tracer wire/PE pipe install, meter install/test, tie-in to 2"main with bolt on tee/EFV and tapped,pressure test and tested gas percentage. - 32179 N Leornard loop -Observations: Line locating, bedding/shading, partial back-fill, tracer wire/ PE pipe install. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Per s Date: Reviewer: Date: 250604 Signature: Signature: a.5ab I,o IPUC Form 4 Rev.12/11/2024