Loading...
HomeMy WebLinkAboutAvista 250521-22 Moscow-Lewiston IPUC Form 4 Avista Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 250521-22 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: Reg station#343 (Moscow) and 5t' and City/District: Moscow/Lewiston Beachy (Lewiston) adjacent to Reg station#403 Contractor/Job #: W/O # 1036308825- Foreman: Operator Supervisor: Lewiston Trevor Salonen On-Site: N Job Description: Weld CP bonding wire (Moscow), System Type: 0 GD Teardown/rebuild 4" steel plug valve. One-Call Ticket: 2025192739 (Lewiston) Total Inspection Days: 1.5 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2. Trenching/Boring-Depth, Clearance 3.15 SAT Vacuum truck 3. Bedding/Backfill 3.15 SAT 4. Pipe Installation (Tracer Wire) 3.13 N/A 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 SAT 7. Manuals-Field Procedures, O & M 1.4 SAT 8. Testing-Pressure, Duration, Type 2.12-13/3.18 N/A 9. OQ Qualifications 4.31 SAT 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 N/A 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 N/A 14. Equipment Calibration Verification 5.11,14,21 N/A 15. EFV Installation 3.16 N/A 16. MAOP 4.15 N/A 17. Purge 3.17 N/A 18. Safety Equipment GESH 4 SAT Extinguisher 19. Abandonment 5.16 N/A 20. Line Locating 4.13 SAT 21. Plastic Pipe 3.23-25 N/A - Joiner(s) Qualified - Fusion Tools - Heat Plate IPUC Construction Inspection - Joining Procedure SAT Welded on CP grounding tabs 22. Steel Pipe -Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 -Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: - Observed Pressure Control Technicians Salonen and Degroat weld tabs to the pipe and install a jumper wire at Regulation Station#343 to address the cathodic protection deficiency on a 4-foot section of 2-inch steel pipe. Following the welding process, the piping was painted, and CP measurements were taken, confining a reading of-1.29, ensuring the deficiency was corrected -Traveled to Lewiston, Idaho,to observe the teardown and rebuild of the EOP valve located at 5th and Beachy Street, adjacent to Regulation Station#403. The crew utilized a vacuum truck to excavate the valve, after which the valve packing nut was removed, cleaned, greased, and reinstalled to enhance operational functionality and pipe was wax wrapped. Corrective Action Required: ❑ Yes No Compliance Letter#: NA Lead Inspector: P 'ns Date: Reviewer: Date: 250522 1-5 05 k% Signature: Signature: