HomeMy WebLinkAboutAvista 250519-250523 IPUC Form 1 - Moscow Field IPUC Pipeline Safety Inspection Inspector(s): Perkins Date(s): 250519-250523 Company/Owner: Avista Utilities Unit/OPID: 31232 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 3.5 Inspection Summary May 19,2025: (1.0 Standard) IPUC inspector Perkins traveled to Moscow, Idaho to inspect field installed operating equipment for the Avista Moscow inspection unit. May 20-21,2025: (1.5 Standard) Met with Avista company representatives in the Pullman, Washington district office for a briefing, reviewed welding records, past year work orders and began field audit of Moscow installed equipment. Inspection was conducted on seven regulator stations, five single-service farm taps, and one odorizer to assess relief operation, regulator lock-up, overall station condition—including pipe-to-soil wrap—and cathodic protection. Additionally, four rectifiers, seven carrier-to-casings were checked for correct cathodic protection (cp), and fifteen valves underwent inspection to ensure ease of operation. Discrepancies: -During an inspection at Regulation Station#343, the CP technician identified a short segment of steel pipe that lacked cathodic protection. In response, the Pressure Control Technician returned to the station and welded a jumper wire to ensure adequate CP protection -On Rectifier 123758 at Palouse River Road, the CP technician was unable to obtain readings due to an excessively high voltage detected on the rectifier housing. This issue was caused by the theft of the grounding wire from the pole. A work order will be issued for the repair, and upon confirmation of the grounding wire replacement, the rectifier will be re-evaluated next year May 21-22, 2025: (See Form 4) May 23,2025: (1.0 Standard) Returned to Boise and completed the inspection report along with necessary audit forms, including the PHMSA IA question set with OQ Protocol 9, IPUC Form 1, and Post-Inspection Preliminary Written Findings. Relevant inspection documents were also attached. Did site visit on Tamarack propane system, investigated potential of Master Meter system. Jun 6, 2025: Received workorder(4501077) for repair of ground wire on Rectifier 123758, confirmed completion/repair on 12 Jun 2025. IPUC Form 1 Rev. 12/11/2024 IPUC Pipeline Safety Inspection Corrective Action Required: ® Yes ❑ No (Completed) Compliance Letter#: NA Follow Up Required: ® Yes ❑ No By Date: 23 July 2025 Lead Inspector: Perjdns, Date: Reviewer: Brooks Date: 250616 Signature: ` Signature: O-Sob 1( IPUC Form 1 Rev.12/11/2024