HomeMy WebLinkAboutAvista 250611 IPUC Form 1 - Kellogg Field IPUC Pipeline Safety Inspection Inspector(s): Brooks, Galli Date(s): 250611 Company/Owner: Avista Utilities Unit/OPID: 31232 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 2.0 Inspection Summary June 11, 2025: (2.0 Standard) (Galli 1.0) (Brooks 1.0) Met with Avista company representatives in the Kellogg District Office for a briefing, reviewed welding records, past year work orders and began the field audit of Kellogg installed equipment. Ten regulator stations were inspected for relief operation, lock-up, general condition of the station including pipe-to-soil wrap, and cathodic protection. Four rectifiers, fourteen carrier-to-casings, 4 bridge crossings and twenty-one valves were also inspected. Wrote inspection report, completed audit forms: PHMSA IA question set with OQ protocol 9, IPUC Form 1, Post-Inspection Preliminary Written Findings and attached inspection documents. Discrepancies: None. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Follow Up Required: ❑ Yes N No By Date: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: i 250616 Signature: Signature: 1S0 (o tb IPUC Form I Rev. 12/11/2024