Loading...
HomeMy WebLinkAbout20220808Staff 1-11 to Atlanta.pdfCHRIS BURDIN DEPUTY ATTORNEY GENERAL IDAHO PUBLIC UTILITIES COMMISSION PO BOX 83720 BOISE, IDAHO,83720-0074 (208) 334-0314 IDAHO BAR NO. 98IO Street Address for Express Mail: I 1331 W CHINDEN BLVD, BLDG 8, SUITE 2OI-A BOISE, TD 83714 Attorney for the Commission Staff BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION IN THE MATTER OF THE INVESTIGATION OF ATLANTA POWER COMPANY SERVICE AND CUSTOMER RELATIONS CASE NO. ATL-8.22.0I FIRST PRODUCTION REQUEST OF THE COMMISSION STAFF TO ATLANTA POWER COMPANY Staff of the Idaho Public Utilities Commission ("Staff'), by and through its attorney of record, Chris Burdin, Deputy Attorney General, requests that Atlanta Power Company ("Company" or "Atlanta Power") provide the following documents and information as soon as possible, but no later than MONDAY, AUGUST 15,2022.r This Production Request is to be considered as continuing, and Atlanta Power is requested to provide, by way of supplementary responses, additional documents that it, or any person acting on its behalf may later obtain that will augment the documents or information produced. I Stuff i, requesting an expedited response. If responding by this date will be problematic, please call Staff s attorney at (208) 334-0314. FIRST PRODUCTION REQUEST TO ATLANTA POWER ) ) ) ) ) ) ) ) ) 1 *li L: l+ I AUGUST 8,2022 REQUEST NO. l,: Please provide all income tax filings for Atlanta Power from 2017 to present. This may include copies of the Schedule C, Form 1065, or other filings etc. REQUEST NO. 2: Please provide the invoices, packing slips, Bill of Ladings etc. for all items purchased for repairs, new construction, or replacements from 2017 to present. REQUEST NO.3: Please provide a schedule showing each customer's usage and billing for each month from 2017 to present. Please include the dollar amounts billed as well as the kWh billed. REQUEST NO.4: Please provide an accounts receivable aging report for December 31, 2020, December 31,2021, and July 30,2022. REQUEST NO. 5: Please provide a complete description of the Company's current system. This should include the following: a. A description of each generation resource including the generation type, type of controls, how it is operated and maintained, amount of average capacity for each season, and constraints and/or deficiencies (e.g., seasonal water flow, planned maintenance, fuel capacity and availability, etc.); b. A description of the distribution system including substations, poles, and conductors, switching mechanisms, how it is operated and maintained, constraints and/or deficiencies; c. Types and number of customers including a description of the customer classes, their average usage, seasonal usage patterns. REQUEST NO. 6: Please provide a scaled system map of the utility. This map should provide a location and reference identifuing each component of the system. For each component, please provide a detailed description that includes the following: a. Generating resources (i.e., generation type, nameplate capacity rating, installation date, and condition); b. Utility poles (i.e., type, installation date, and condition); c. Utility transformers (i.e., type, ratings, installation date, and condition); d. Wire conductor (i.e., type, rating, installation date, and condition); e. Service connections (i.e., type, rating, installation date, and condition); FIRST PRODUCTION REQUEST TO ATLANTA POWER 2 AUGUST 8,2022 REQUEST NO. 7: Please provide a list of all utility assets (with documentation) identi$ing the following for each: a. Asset identifier (Serial number, Asset inventory number, etc.); b. Whether it is installed or held in inventory; c. Condition ofthe asset (unused/new or used/reconditioned, operational or salvage, etc.); d. Date of purchase; e. Date of installation; f. Original cost with installation cost broken out separately; g. Current book value; h. Depreciation rate. REQUEST NO. 8: Please identiff and describe any deficiencies and what action, if any, is needed to address system reliability, system integrity, and/or support potential growth. For each deficiency, please provide the following: a. Improvements and/or investments the Company plans to implement to address each individual deficiency. b. Please include the costs and benefits for each investment REQUEST NO. 9: Please identifi and describe all maintenance improvement projects to the utility plant over the past 5-years. Please include documentation for each project. REQUEST NO. 10: Please provide the past 5-years of monthly energy use for all meters located at 170 Middle Fork Rd., Atlanta, Idaho 83716. REQUEST NO. 11: Please provide the Company's 5-year plan for the purchase and installation of future utility plant assets. FIRST PRODUCTION REQUEST TO ATLANTA POWER 3 AUGUST 8,2022 DATED at Boise,Idaho, ttris (11 day of August2022. a*ul t Chris Burdin Deputy Attorney General i:umisc:prodreq/afle22. lcbksk prod req I FIRST PRODUCTION REQUEST TO ATLANTA POWER 4 AUGUST 8,2022 CERTIFICATE OF SERVICE I HEREBY CERTIFY THAT I HAVE THIS 8TH DAY oF AUGUST 2022, SERVED THE FOREGOING FIRST PRODUCTION REQUEST OF TIIE COMMISSION STAFF TO ATLAI\ITA POWER COMPANY, IN CASE NO. ATL.E.L2.OI, BY MAILING A COPY THEREOF, POSTAGE PREPAID, TO THE FOLLOWING: ISRAEL RAY ATLANTA POWER COMPANY 508 AUKLET PLACE FAIRBANKS AK 99709 E-MAIL: israelray I 958@gmail.com GENE HAUGHT 235 WEST YUBA DRIVE ATLANTA,ID 83716 E-MAIL: pgfd247 @yahoo.com CHRISTOPHER R NUNEZ McANANEY & ASSOCIATES IIOI RTVERSTSTE IOO BOISE ID 83702 E-MAIL: crn@mcananey.us -h,/LA,-r,SECRET&-Y// CERTIFICATE OF SERVICE